Asbestos-related air sampling plan, Feb 2002

Machine-extracted title · confidence 45%

Plan for surface cleaning verification and aggressive air sampling by NYCSCA/ATC during school cleanup.

NYC-WTC_000419035
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document ATC @003/003 02/04/2002 18:36 FAX 212 353 8306

104 East IS-* Sheet 10"' Floor New York, New York 10010-2917 212.353.S2S0 Fax 212.353.8306 ASSOCIATES INC.

Mr, Bernard P, Orlan May 2, 2002 Pagel

• Following the cleaning of these areas, a visual inspection shall be conducted by an independent third party project monitoring Erm and/or New York City School Construction (NYCSCA) representatives to verify that all surfaces have been properly cleaned and are free of visible dusbdebris.

• Aggressive air sampling shall be perfonned on a floor-by-floor basis as the cleaning work progresses. Air sampling shall be conducted in compliance with all applicable local, state and federal regulations. In areas where the ceiling system has not been removed, that is, where sheetrock and/or plaster- ceilings exist, aggressive air sampling shall be conducted both above and below the ceiling, ATC Associates Inc. will perform this air monitoring.

• Air samples shall be analyzed via Transmission Electron Microscopy (TEM) methodology. Successful air clearance shall be achieved when all air samples collected within the building are below 70 structures per millimeter squared (<70 str/rmn^) - TEM analysis.

• Following successful air clearance sampling on each floor, the Contractor will install new ceiling tiles and/or install access hatches where applicable on that floor. The area below these ceilings will be recleaned following the installation of the new materials.

Kiss Consh-uction, Inc. has been retained by NYCSCA to perform this work. Tins project is scheduled to commence at 8:00 AM on February 5. 2002, Kiss Construction has estimated that this work will be completed within four weeks.

If you have any questions or comments regarding the scope of work, please do not hesitate to contact us at your earliest convenience.

Sincerely,

ATC ASSOCIATES INC.

Mark Tefjesen Senior Project Manager

MT/dc

Cc: A. Lempert - SCA E. Duke - SCA C. Proctor - UFT E. Telemaquc-EMTEQUE

CITY_21MC100_013073734

NYC-WTC_000419035

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000419035Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000453767

Scope of work for plenum cleaning at Stuyvesant High School, meeting attendees listed.

Similar indexed content

Compare copies and versions →