NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 60 pages

Asbestos control memo, OCR building air tests, 2002

Machine-extracted title · confidence 24%

Memo discussing ongoing cleaning and air testing for OCR building, indoor/outdoor air quality results, HEPA filtration details.

NYC-WTC_000418420–000418479
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document I :rr miKtit*! •* >

Sep-21-Ol 09:37 P.O4

Page 3 of 3 IBM Corporation Office Facility 4

O&M CLEAN-UP OF SUSPECT ACM DEBRIS 33 MAIDEN LANE 2“', 3'^ and S* Floor

4. Lcxial negative ventilation will run continuously during cleanup. Operating HEPA ventilation units should be placed within the fresh air intake and exhausted to the outside.

5. All gross debris in the work area shall be considered asbestos contaminated material. Prior to removal from the work area all ACM contaminated material shall be adequately wetted with amended water and either properly double bagged or HEPA vacuumed.

6. Detailed cleaning ofthe work area shall be perfotmed using HEPA filtered vacuum equipment and/or wet cleaning. Methods that rase dust, such as dry sweeping or. vacuuming with equipment not equipped with HEPA filters, will not be permitted.

7. All tools used during cleanup operations shall be decontaminated via wet wiping and HEPA vacuuming.

8. PCM air monitoring will be performed within and adjacent to the cleanup area during cleaning.

9. If air sampling results indicate any airborne asbestos fiber concentrations at or above 0 01 fibers per cubic centimeters wort shall be stopped immediately, and raeihods shall be altered to reduce the asbestos fiber concentration.

10 Once the cleanup area is inspected and determined dry and free of debris, tleaiance air tests may be performed.

11, Following a minimum drying time of one hour after wet cleaning has been completed, an authorised and qualified individual; independent of the removal project, (i.e.; the Air Sampling Technician, Project Monitor or Design Engineer); shall determine if*the surfaces in the work area are dry. Once the work area has been inspected and found to be dry, TEM static clearance air sampling may be performed.

environmental consulting and training

00232

CITY_21MC100_011971221

NYC-WTC_000418432

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000418432Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →