QES&T permit application cover sheet for 56 Nassau Street, Sep

Machine-extracted title · confidence 90%

Fax cover sheet from QES&T submitting a proposed work scope and TEM air sample reports to the DEP for 56 Nassau Street in September 2001.

NYC-WTC_000097968–000097970

Folder label: “56 NASSAU STREET BIN: 1001109 33 Maiden Lane, 29-39 Maiden Lane/32-40 John St/ 1 Federal Reserve Plaza

Page image
Scanned page image, NYC-WTC_000097970
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Sep-21-01 09:37 P.04

Page 3 of 3 IBM Corporation Office Facility

O&M CLEAN-UP OF SUSPECT ACM DEBRIS 33 MAIDEN LANE 2°I, 3'a and Floor

4. Local negative ventilation will run continuously during cleanup. Operating HEPA ventilation units should be placed within the fresh air intake and exhausted to the outside.

5. All gross debris in the work area shall be considered asbestos contaminated material. Prior to removal from the work area all ACM contaminated material shall be adequately wetted with amended water and either properly double bagged or HEPA vacuumed.

6. Detailed cleaning of the work area shall be performed using HEPA filtered vacuum equipment and/or wet cleaning. Methods that raise dust, such as dry sweeping or. vacuuming with equipment not equipped with HEPA filters, will not be permitted.

7. All tools used during cleanup operations shall be decontaminated via wet wiping 4nd HEPA vacuuming.

8. PCM air monitoring will be performed within and adjacent to the cleanup area during cleaning.

9. If air sampling results indicate any airborne asbestos fiber concentrations at or above 0.01 fibers per cubic centimeters work shall be stopped immediately, and methods shall be altered to reduce the asbestos fiber concentration.

10. Once the cleanup area is inspected and determined dry and free of debris, clearance air tests may be performed.

11. Following a minimum drying time of one hour after wet cleaning has been completed, an authorized and qualified individual; independent of the removal project, (i.e.: the Air Sampling Technician, Project Monitor or Design Engineer); shall determine it'the surfaces in the work area are dry. Once the work area has been inspected and found to be dry, TEM static clearance air sampling may be performed.

ENVIRONMENTAL CONSULTING AND TRAINING

NYC-WTC 000097970

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000097970Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000097971 · Box DEP Box 33

Letter from Federal Reserve Bank of New York providing results of hazardous component testing at their facilities following the September 11 attacks.

Filed in the same folder

Compare copies and versions →