Asbestos control memo, OCR building air tests, 2002

Machine-extracted title · confidence 24%

Memo discussing ongoing cleaning and air testing for OCR building, indoor/outdoor air quality results, HEPA filtration details.

NYC-WTC_000418420–000418479
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

3ep-21-Ol 03:37 P - 03

I

Page 2 of 3 IBM Corporation Office Facility 4

O&M CLEAN-UP OF SUSPECT ACM DEBRIS 33 MAIDEN LANE I"", S '’and S'" Floor

NATURE OF WORK:

TEM air samples eollecled within each floor did not identify any elevated levels of : airborne asbestos. Visual examination of the interior spaces did not identify significant accumulations of dust or suspect debris. Calieetion of bulk material samples identifim a small quantity, approximately 3 SF, of ACM debris on the carpet in the 3"’ Floor ofTui area. It appears this material was either tracked in or brought in from outside the building. Additional bulk samples were collected within the 2"'*, 3*^ and S'* Floor office areas am ventilation fresh air intakes. With the exception of the one sample identified above, pLm analysis of bulk samples did not identify- asbestos above the 1% threshold for c lassi fioanon as ACM. Due to die identification of ACM in the one balk sample. IBM Corp., has ’ requested that an O&M cleanup be performed within the entire 3" Floor leased space. Although bulk sampling conducted within the 2"^ and 5“ Floor did not identify the ; presence of asbestos, IBM Corp has requested that an O&M cleaning be performed within these spaces as well. Each floor consists of approximately 14,000 SF of office space, The project will include HEP .A. vacuuming of all floor surfaces and wet-wiping of all horizontsl bard surfaces (i.e. desks, file cabinets, sills). At the completion of the clean-up, static 'TEM air samples will be collected within each floor. No abatement of installed ACM w-il! be performed as part of this project.

We propose io do the following;

1. Building/'equipment surfaces will be cleaned using HEPA vacuums or wet wiping, Loose material on floors shall be wet thoroughly with amended water prior to disturbance and either placed directly into labeled bags or HEPA vacuums.

2. Adequate signage shall be posted around the affected area. A curtained dooway shall be installed at the main entrance to each office area.

3. Workers will double suit prior to entering the affected area. Prior to leaving the affected area die worker shall remove the outer suit in the airlock, don a new outer suit, and protesd directly to a remote shower facili ty.

environmental consulting and training

00231

CITY_21MC100_011971220

NYC-WTC_000418431

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000418431Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →