NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 29 pages

NYC DEP air sampling resuls, 2001

Machine-extracted title · confidence 35%

Air sampling results for 130 [name] with DEP correspondence details.

NYC-WTC_000418094–000418122
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document iWrr —-.r'K,* *■. A* -.rt 1- r.n-WJ-.

From: Joel Kupferman, Esq. To; AiSHA - JOEL MIELE Date: 4/17/2002 Time: 10:06:08 AM Page 1 of4

>■

NEW YORK EWIROnMENTAL LAW & JUSTICE FROJ ECT tnemi^r the clean Water mempsrs^fhe !\laitot.’a} Lswyerx Outy

315 Broadway, Suite 200 Joel R. Kuffamian, Hs^.; Ttnetmtivs Ditedor New Vai, Nsr 10007-1131 K^itrJvrki t'alky Anafyei Tel ; 212-766-9910 Charts Pk.D : Seien'Klit! Do-ta Aualyd:

Intcmwelj: waur,Tiggnm}laui.oirg «-tuail: rt^’^p&'fusik-s.CJWi

April 17. 2002 Department of Environmental Protection Bureau of Air, Noise and Hazardous Materials /\8bestcs and Lead Control Program 59-17 Junction Blvd. Corona, NY 11373 Tei: (718)696-3662 Fax: (718) 595-3749

Attention: Joel Miele - Aisha Compliant# 43534a RE; Asbestos Condition at 150 Franklin Street, NY, NY 10013 Building Owner: 150 Franklin Street Cooperative Inc.

Dear Department of Environmental Protection

This letter is a formal notification of a compiaint with regards to a high level of asbestos contamination at 150 Franklin Street Cooperative Inc. which were tested with results of 1.2%,1.4% & 1.6% . Proper asbestos abatement methods as required by law and regulation whenever asbestos exceeds 1% - especiaiiy in cases of an educational institutionai presence.

W© require immediate action due to the fact that there is a operating Day Care Center present on th© third floor. We demand that DEP ensure that any construction work on the roof including but not 'irrited the building of a bulkhead be stopped. Work is scheduled has begun today by the General Contractor; Grand Renovation, Inc,

Asbestos had been found to have contaminated the seven floor as asbestos tainted tar penetrated through the roof approximately two years ago.

These samples were analyzed by: EMSL Analytical, Inc. 307 West 38* Street NY NY’ 10018 - EMSL Order 030204912 analysis date 4/16/02 .

09662 CITY_21MC100_011970673

NYC-WTC_000418118

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000418118Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →