NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 19 pages

February 2002 letter re: Fulton Street property

Machine-extracted title · confidence 40%

Chain-of-custody/communication about bulk sampling and PLM analysis at 106 Fulton Street.

NYC-WTC_000417869–000417887
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document ' .'-.-J J TSai -

GOLDEN CORPORATION Occiipalional Health, Safety & Environmental Consultants

February 25,2002 Mr. R. Radhakrishnan, P.E. New' York City Department of Environmental Protection Director, Asbestos Control Program 59-16 Junction Boulevard Corona, NY 11368-5107 Via Fax; 718.595,4422

Re: Pace Uni versity Property 106 Fulton Street, NY, NY

Dear Mr, Radhakrishnan,

Idiank you for taking the tune to talk with me on February 19, 2002 regarding your letter of February 17, 2002 (attached) feat was issued to our client. Pace University. As I mentioned, the 106 Fulton Street building has been unoccupied since before September 11,2001.

Tn response to your February 17**' letter and in accordance wife our conversation of February 19th, on February 19® a Golden Corporation NYC licensed asbestos investigator conducted a visual review of fee exterior of 106 Fulton Street and collected ten bulk samples of dust from exterior surfaces. Samples were analyzed by Scientific Laboratories using Polarized T.ight Microscopy (PLM). Scientific Laboratories is an AIHA accredited and ELAP certified laboratory, A summary of the surfaces sampled and corresponding analytical results are presented below.

Sample ID Surface sampled Asbestos content in dust # 106-1 Roof - NW comer on parapet wall ■<T% # 106-2 13'" floor exterior window ledge < 1 % # 106-3 8” floor exterior window ledge <1% # 106-4 8* floor exterior window ledge < 1 % #106-5 2"^ floor exterior window ledge < 1 % # 106-6 Top of exterior construction elevator car <1 % #106-7 15'*' floor extenor construction bridge < 1 % #106-8 10'^ floor exterior construction bridge <1 % #106-9 7^ floor exterior construction bridge <1% < 1 % ■’ #106-10 4''^ floor exterior construction bridge

All sample analysis sesults are less than one-percent asbestos. Laboratory reports, chain of custody records and field data sheets in support of this data are attached.

It is our understanding that the City requires the building owner to remove accumulations of dust from exterior building surfaces. And, that asbestos handler licenses are not required for cleaning non-ACM dust, including dust reported to contain less than one-percent or trace asbestos as detected under PLM.

notiwi Mtwis Building • 100 North 17’” Street, 9" Ftoor ■ Philadelphia, PA 191();1 Tcl 215 496 9237 ■ Fax 21.5 496 9280 • ioli Free 800 586 5580 - www,coldon.com 09688

CITY_21MC100_011065383

NYC-WTC_000417869

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000417869Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →