NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 30 pages

Lab report, bulk/air samples, NYC-WTC 2001-2002

Machine-extracted title · confidence 38%

Air and bulk sample results at WTC-related location; negative/positive sample counts recorded.

NYC-WTC_000417048–000417077
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document i-j'-jw-i zzn ' ■Tr;4..wi. a h ■.■un?-- 'a; • •: :-lr5T t-t T -J

10/24 '01 11:28 1u:HTtKIUHN 1tUMNULUb1tb rHksc XV

VI, CONTINO RNCIES

A. Pricing is based on union rates. ii. Due to the magnitude of this loss, there will probably be some work that needs to be done that we do not see now. As new scope is added, it will be reduced to writing and attached to this preliminary scope. C’. The proposed schedule can be attained as long as good coordination exists between all parties involved, o. Wc performed ius thorough an investigation as possible during our inspections of the September 21,2001. 1 lowever, once the work begins, we realize that items of concern may come to our auenticn, which have not been directly approached in this ■scope. This is not uncommon due to the complex nature of the problems that ex isi.

VII. PROJEC’IW COSTS

We have prepared a projected cost estimate based on industry standards using time and material pricing. Thi.s estimate litis been prepared based on our investigation, discu.s,sions with personnel and review of the property. Prom past experience with this type of project, the estimate appears coniplcic. However, also from past experience because of the cntnple..X!iies that are involved with this project, there may be some new information that i.s discovered as the work progresses, which could cause our scope of costs to change, - .....

American Teciinoktgies, Incorporated agrees to perform the work described in this proposal for the projected ensi« ofS 229,602.50. (See '['he Attached Projections.) This is to include ail labor, materials, equipment and sLib.sistence.

The insur^wiil need to si^jpef^ork & Fay /Authorization tojndude American Tcdn^-igies. Inc. / American Ile.storatiomas a loss paycg,4>h the insurance claim.

B. PaymenL will be made in progrcJMive payments, a deposit of $ 25.000 is due upon acceptance and the balance is due in weekly progre,ss payments submitted each Tuesday for the previous work completed. Payment will be due within three days after receipt of invoice or by Friday of the same week.

09735 CITY_21MC100_008874486

NYC-WTC_000417055

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000417055Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Fax transmission cover, 2002

NYC-WTC_000421507

Fax cover sheet with route and page count; transmission metadata for DEP documents.

Similar indexed content

Compare copies and versions →