NYC 9/11 Public Portal Document
10/24 '01 11:27 ID:A11ER1Cc N ItCHNULUu1tS t-►-v :U1ts— tvu—v4 r.uc u
October 10, 2001
Jeff Kiarfeld
Jakobson Properties
I I Waverly !'lace
New York, NY 10003
It 1 is Insured
110 C#reenwich
Now York, NY 10003
Dear Mr. Klarfeid:
American 'Technologies Inc., American Restoration conducted an inspection on September 21, 2001
due to damage resulting from an explosion originating on September 11, 2001. As a result of the
investigation and discussions, we are prepared to make some recommendations and can separate our
involvement into a scope of work. The preliminary scope covers the circumstances. workflow.
restoration services, contingencies and cost projections.
American Technologies. Incorporated, American Restoration has been asked to prepare a cost
estimate fbrJak omProp ies at the above referenced address. Outlined below is a Scope of
Work. L L Cu c.
Scone of Work
I. CIRCUMSTANCRS
A. The explosion started at the World Trade Center causing moderate to heavy concrete
dust and soot lallout in the entire apartment complex.
B. The entire building area of the facility has suffered varying degrees of'damage from
soot failout, concrete dust and concrete odor.
NYC-WTC 000105018
OCR can misread numbers and units. Confirm readings against the page image before using them.