V1. CONTINOENCiES
A. Pricing is based on union rates.
It. Due to the magnitude of this loss, there will probably be some work that needs to be
done that we do not see now. As new scope is added, it will he reduced to writing
and attached to this preliminary scope.
C'. 'l'he proposed schedule can be attained as long as good coordination exists between
all parties involved.
D. We performed as thorough an investigation as possible during our inspections of the
September 21, 2001. 1 lowever, once the work begins, we realise that items of
concern may come to our attention, which have: not boon directly approached in this
scope. This is not uncommon due to the complex nature of the problems that exist.
VII. PROJECTED COSTS
We have prepared a projected cost estimate based on industry standards using time and
material pricing. This estimate has been prepared based on our investigation, discussions
with personnel and review of the property. From past experience with this type oi project,
the estimate appears complete. However, also liom past experience: because of the
complexities that are involved with this project, there may be some new information that is
discovered as the work progresses, which could cause our scope of costs to change.
American 'Technologies, Incorporated agrees to perform the work described in this proposal for the
projected costs of$ 229,602,50. (See The Attached Projections.) This is to include all labor,
materials. equipment and subsistence.
A. The insured ill need to si a4ork & Pay Authorization to include American
Tcchnn nes, Inc. / American Restorationasa loss payc t he insurance claim.
H. Payment will he made in progressive payments. a deposit of $ 25.000 is due upon
acceptance and the balance is due in weekly progress payments submitted each
'Tuesday for the previous work completed. Payment will be due within three days
after receipt of invoice, or by Friday of the same week.