NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 2 pages

Daily News: Rebuilding WTC area maps

Machine-extracted title · confidence 28%

Ground Zero rebuild maps show utility mapping and buried utilities.

NYC-WTC_000415748–000415749
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

DAILY NEWS, TUESDAY, DECEMBER 11, 2001

Rebuilding WTC area from the By GREG GITTHfCH DAILY NEWS STAFF WR.TER ground down Five blocks south of the smoldering mounds of rub­ ble at Ground Zero, an unimpressive bump of pave­ maps the entire underground, so the utility companies must ment — rising only slightly higher than the sidewalk consult their own maps, exam­ — is spray-painted with a glaring warning. ine historical documents and do CAUTION * HIGH VOLTAGE ” insurance wui not cover au a lot of sleuthing. New radar The innocuous bump extends technology that essentially takes about 5 feet along Washington the costs, and customer rates sonograms of the city's underbel­ St. before disappearing into a could rise to pay for the repairs ly will help workers determine narrow wooden box that snakes and technology improvements, where buried pipes and cables officials said. run before the streets are tom its way around the perimeter of the destroyed World Trade Cen­ Paul Crotty, Verizon group up. ‘ ter. president for New York and Con­ necticut, told an Assembly hear­ “You dig, then design, then re­ In the rush to restore electrici­ build — in that order,” Corvese ty after the terrorist attacks, Con ing yesterday that the company hopes to receive special tax cred­ said. Edison laid 36 miles of high-volt­ Con Ed has 252 active con­ age cable above ground and its. He said Verizon hasn’t con­ sidered “rate increases that struction permits in the disaster area. Its largest dig is on Rector St. ' sentially circled the disaster , The four-block stretch is area with a giant extension cord aside $900 million in federal aid closed to traffic, and the paved , to bypass substations destroyed for infrastructure repairs. But it surface has been tom out in big , by the falling towere. was unclear how much of that chunks. Eighteen-foot timbers Verizon had the same idea, would be available to Verizon cover the city’s complex under­ stringing telephone lines along and Con Ed, Public Service Com­ pinnings when workers aren’t the streets to subterranean mission Chairwoman Maureen toiling in the hole. switches not buried by debris. Helmer told the panel. While buildings in that part of The fixes were successful, but 'A complete rebuild' the city reach into the clouds, it 1 ( temporary. In recent weeks, the But by any measure, the task couldn't be more different under; “ utility giants have moved aggres­ ahead is enormous. ground. Con Ed hardhats could^^l sively to rig a permanent solu­ “This job is a complete re­ dig down only about S feet be­ tion. build,” said Arthur Corvese, Con fore reaching sewer lines and a* The entire underground tele- Ed section manager for Manhat­ lOO-year-old water . main that' sr communications and electricity tan construction, runs above the subway tunnels J tidu network in the Financial District “On these narrow streets, Everything — electrical con'-v^Y must be rebuilt. ’That means rip- there is only one way to do it," duits, copper and fiber-optic-™ ping up about 24 streets from he said. “You shut down the phone lines, manhole shafts;'Yto Barclay St. to Battery Place to re- street, rip out all of the old stuff television cables, gas pipes and- ’’x pair and install electrical and and then figure out how to make , a new 20-inch water main — telephone conduits. everything fit.” must be squeezed into the shal­ “This is like nothing else be- To prevent individual streets low space between the sewers fore," said Joe DeMauro, Veri- from being closed multiple and pavement. - zon's regional president. times, the mayor's Office of “If we had 60-foot-wide More than 300,000 telephone Emergency Management and an streets, everything would have lines were severed. About infrastructure task force from an obvious spot,” said Tom Fet­ 13,000 customers lost power, the Federal Emergency Manage- ter, a Con Ed construction boss. : Nearly 6 miles of water mains ment Agency are coordinating •TTiis is crowded. This is about broke. the repairs. as had as it gets." The final repair tab will come However, no single agency to at least $2.3 billion, based on ------- ---------- Two new substations estimates by Con Edison, Veri­ Con Ed officials hope to re­ zon and the city Department of place the temporary above­ Environmental Protection, ground cables with buried lines which manages the city’s water by May I, The conduits will be supply. routed to a giant new substation ' . » _ *1* • ■* on South St. that will replace -3GLbf3

CITY_21MC1OO_O11834O54

NYC-WTC_000415748

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000415748Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000412303

Describes debris at the World Trade Center site and transit damage.

Similar indexed content

Compare copies and versions →