NYC-WTC_000413402
Analysis of subway tunnel repair costs and timelines post-9/11.
1 shared non-person entities · 1 shared topics · similarity 0.920
machine-extracted · confidence unavailable · Check page ↗Beams, tunnels, and stations damaged; rebuilding costs anticipated.
NYC-WTC_000412885–000412886OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
THE NEW YORK TIMES. FRIDAY, SEPTEMBER 28, 2001
Subway at Trade Center to Take Years to Rebuild[
1 i
New Yuck Ciiy T runs it
I-beams and rubble cover the tracks of the 1 and 9 line in Lower Manhattan. A mile of tunnel needs rebuilding.
I By RANDY KENNEDY Ithat has been pledged to the city inI collapsed, in two separate locations, New York City Transit officials )the wake of the attack on the WorldI but subway engineers who have ex-. have determined that damage to the Trade Center. plored the tunnels say that hundreds^ ' No. 1 and 9 subway tunnels and sta The only guide to what the project more feet are structurally unsound,! tions in Lower Manhattan is so ex- 'might cost comes from rough esti■ with thick I-beams bent like paper ' tensive that the line will need to be 'mates for the long-planned SecondI clips and ceilings sagging under the completely rebuilt for more than a Avenue subway, which plannersI weight of millions of tons Of debris, mile. ’think would cost about $l billion aI from the World Trade Center on the' The work on the line from just 'mile. But that is for building a new street‘’above. south of Chambers Street all the way line 1 from scratch and carving its1 In several places, ' individual' to the end, at the South Ferry station, 1tunnels deep beneath the streets. A beams from the trade center weigh-, could take more than two years, irebuilt section of the 1 and 9 lineI ing tons punched through the street, transit officials said this week, add- 'would most likely follow the tunnelI through about seven feet of earth and ■ ing that they could not speculate <cavity that already exists and wouldI through the concrete-and-brick tun-; • beyond that. They also declined to <cost less. nel ceiling, and then kept on going estimate the cost because they did About 575 feet of the line is totally into the tunnel floor, where they re-. not want city, state and federal offi- j , main lodged like spears. I cials to hold them to an amount that : "There is so much damage that it could turn out to be insufficient. , ■ does not make any sense to rebuild it 1 Transit officials say they expect \in sections,” said Mysore L. Nagar- | ■ money to rebuild the subway to come 'from the $20 billion in federal aid
CITY_21MC100_011830309
NYC-WTC_000412885
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000413402
Analysis of subway tunnel repair costs and timelines post-9/11.
1 shared non-person entities · 1 shared topics · similarity 0.920
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000412303
Describes debris at the World Trade Center site and transit damage.
1 shared non-person entities · 1 shared topics · similarity 0.916
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000412783
US News & World Report analysis of NYC’s post-attack redevelopment plans.
1 shared non-person entities · 1 shared topics · similarity 0.913
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000412264
Narrative about debris search at Fresh Kills Landfill in Staten Island after 9/11.
1 shared non-person entities · 1 shared topics · similarity 0.908
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000412153
Subway and bus service status and station conditions post-attack.
1 shared non-person entities · 1 shared topics · similarity 0.907
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000415748
Ground Zero rebuild maps show utility mapping and buried utilities.
1 shared non-person entities · 1 shared topics · similarity 0.906
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000413635
Lobbying/engineering note on station restoration; no testing data.
1 shared non-person entities · 1 shared topics · similarity 0.903
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000413284
Photo-caption-style clipping about missing persons posters in NYC.
1 shared non-person entities · 1 shared topics · similarity 0.901
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000412802
New York Times excerpt; description of recovery work and agencies involved.
1 shared non-person entities · 1 shared topics · similarity 0.899
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000413906
New York Times front-page excerpt mentioning subway lines and authority officials.
1 shared non-person entities · 1 shared topics · similarity 0.898
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000152327
A financial document from late September 2001 related to water supply operations and emergency response costs.
1 shared non-person entities · 1 shared topics · similarity 0.905
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000152214
News article discussing gaps in City's post-attack security measures and recommendations for comprehensive defense strategy.
1 shared non-person entities · 1 shared topics · similarity 0.900
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000152327
A financial document from late September 2001 related to water supply operations and emergency response costs.
Similarity score 0.987 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000413348
Staten Island Advance notes subway restoration options for Lower Manhattan after collapse.
Similarity score 0.961 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000152327
A financial document from late September 2001 related to water supply operations and emergency response costs.
Similarity score 0.961 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000413402
Analysis of subway tunnel repair costs and timelines post-9/11.
Similarity score 0.954 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000142915
Document describing the rebuilding and reopening of transit line and stations at the World Trade Center site following September 11, 2001 damage.
Similarity score 0.952 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000412392
Layout of World Trade Center operation centers and transit notes.
Similarity score 0.950 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Machine-extracted building matches; verify each source. Buildings, never households.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000413402
Analysis of subway tunnel repair costs and timelines post-9/11.
Similar indexed content
Describes debris at the World Trade Center site and transit damage.
Similar indexed content
NYC-WTC_000412783
US News & World Report analysis of NYC’s post-attack redevelopment plans.
Similar indexed content
NYC-WTC_000412264
Narrative about debris search at Fresh Kills Landfill in Staten Island after 9/11.
Similar indexed content
NYC-WTC_000412153
Subway and bus service status and station conditions post-attack.
Similar indexed content