NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 1 page

Downtown traffic power lines, Dec 2001

Machine-extracted title · confidence 15%

Con Edison project to install power lines; impacts on Lower Manhattan streets.

NYC-WTC_000415394
Page image
Scanned page image, NYC-WTC_000415394
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

NEW YORK POST, SATURDAY, DECEMBER 1, 2001

Con Ed work adds to downtown traffic woes By MAGGIE HABERMAN But the temporary lines aren’t heavy 1 EXCLUSIVE enough to handle the demand. , Fearful of an air-conditioning overload. Con Edison workers have started tearing That means that several of the main । up dozens of lower Manhattan streets to projected to cost about $400 million, and thoroughfares south of Canal Street face . install permanent power lines to handle Clendenin said Con Ed hopes the outlay excavation so new cables can be laid. I the summer energy surge. will be covered by federal aid and that no Two new substations are being built to ; The work requires digging up major rate increase is planned. handle the additional power demand — roads near ground zero — closing even Some 13,000 Con Ed customers lost one added to the South Street substation, more streets in an area where traffic is power when the terror attacks knocked and another that will be built by 2003. often at a standstill. out two substations at 7 World Trade There will also be sAne digging for j Con Ed spokesman Mike Clendenin said Center, and another one on South Street. steam and gas lines, but those projects . the target date for finishing is May 1. Working around the clock to install a aren't as massive. Con Ed says. | “We met every challenge of Sept. 11, and temporary system, 850 Con Ed workers Company spokesman fohn Bonomo said ' we’ll meet this one," he said, had most power restored within a week. the company is working to fix some of j Clendenin said excavation and con­ The 36 miles of temporary cables, pro­ lines damaged at its plant near Washing­ struction has already started on Rector tected by wooden planks and small pe­ ton Street, and will also be excavating to Street, west of Broadway. destrian bridges, connect to the South install new, permanent lines. 1 „uThe.street digging and new, cables.are. ‘Street, suhstatwn, which isirtmning again., , . Wt.work.won’t• sdJ bib I" .bica ad ".sew

CITY_21MC100_011833571

NYC-WTC_000415394

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000415394Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000415748

Ground Zero rebuild maps show utility mapping and buried utilities.

Similar indexed content

Compare copies and versions →