§1-24 TITLE 15—DEPT. OF ENVIRONMENTAL PROTECTION
§1-24 Projects Requiring NYC Buildings Department Plan Amendment.
(a) If the amendment is for work at the same work area(s) covered in the
original application, a copy of the originally-submitted “Not an Asbestos
Project” form or “Asbestos Inspection Report” shall be submitted together
with the amendment to the NYC Buildings Department.
(b) If the amendment is for work at (a) work area(s) not covered in the
original application, the applicant shall file according to the §1-23 procedures
for an original Building Alteration/ Renovation/ Modification application.
§1 -25 Projects Not Requiring Any Buildings Department Plan Approvals
or Permits. The purpose of this section is to require that notification of
asbestos projects be provided directly to the DEP in circumstances where-
filing for Buildings Department plan approval or permit issuance is not
required. This includes instances where filings with the Buildings Depart
ment are for other than plan approval or permit issuance; where no filing is
required because the Buildings Department has decided not to require it; and
where no filing is required because the Buildings Department is without
authority to do so.
(a) This section shall apply to the following categories:
(1) Removal, encapsulation, enclosure or replacement of asbestos-con
taining materials (including insulation); and
(2) Work in or into plenum spaces of existing buildings (e.g. electrical,
ventilation, cable, sheet metal work, etc.); and
(3) Removal of asbestos-covered structures and equipment such as
boilers, pipes, etc.; and
(4) Other miscellaneous activities not previously exempted.
(b) Work not constitutiTig an asbestos project. Ifthe work is not an asbes
tos project, no notification or fee payable to the department shall be required,
unless notification and fees are otherwise required by these regulations.
(c) Asbestos projects. If the cumulative total of all surfaces affected by the
work is an asbestos project, the department’s “Asbestos Inspection Report,”
completed by the building owner or authorized agent, and listing each work
area within the building separately, shall be submitted directly to the
Department of Environmental Protection one week in advance of the start of
the work along-with a filing fee in the following amounts:
(1) For work which will disturb more than 25 linear feet but less than
100 linear feet, or more than 10 square feet but less than 50 square feet, of
* friable asbestos-containing material, the fee shall be $200.