NYC 9/11 Public Portal Document
CHAPTER 1—ASBESTOS CONTROL PROGRAM §1-23
(c) Asbestos project notification. (1) Small asbestos projects. If the cu
mulative total of all surfaces affected by the work for which plan approval
is sought is a small asbestos project, the department’s “Asbestos Inspection
Report,” completed by the building owner or authorized agent, and listing
each work area within the building separately, shall be submitted to the
NYC Buildings Department, together with the appropriate Buildings De
partment application form(s) and a department filing fee in the following
amounts;
(i) For work which will disturb more than 25 linear feet but less than
100 linear feet, or more than 10 square feet but less than 50 square feet
of friable asbestos-containing material, the fee shall be $200.
(ii) For work which will disturb at least 100 linear feet and less than
260 linear feet, or at least 50 square feet and less than 160 square feet,
of friable asbestos-containing material, the fee shall be $400.
(2) Large asbestos projects. If the cumulative total of all surfaces af
fected by the work for which plan approval is sought is a large asbestos
project, the Department’s “Asbestos Inspection Report,” completed by the
building owner or authorized agent, and listing each work area within the
building separately, shall be submitted to the NYC Buildings Department,
together with the appropriate Buildings Department application form(s)
and a Department filing fee as follows?
(i) For work which will disturb at least 260 linear feet and less than
1000 linear feet, or at least 160 square feet and less than 1000 square
feet, of friable asbestos-containing material, the fee shall be $800.
(ii) For work wruch will disturb 1000 linear feet or more, or 1000
squeire feet or more, of friable asbestos-containing material, the fee shall
be $1200.
(d) Modification of or deviation from the information provided in any
notification submitted to the Department of Buildings under this section shall
immediately be reported in writing directly to DEP if the change refers to the
identity of the building owner or ACM removal contractor or the air monitor
ing firm; or the amount of ACM to be removed; or the dates of the project; or
the specific project location. A notification may be modified no more than
twice. A modification is valid only if it is received by the DEP prior to the
previously filed date of completion, except for start date changes which must
be received one (1) day prior to the original start date. Thereafter, a new
notification submitted directly to the department will be required. A notifi
cation to Department of Buildings or DEP shall be valid for one year from the
date of original filing.
5735 KCNY 5-31-98
CITY_21MC100_006242956
NYC-WTC_000411825