NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 75 pages

RCNY Chapter 1 asbestos regulations, 1998

Machine-extracted title · confidence 38%

COSH-related NYC RO regulatory chapter on asbestos control.

NYC-WTC_000411802–000411876
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

CHAPTER 1—ASBESTOS CONTROL PROGRAM §1-26

(2) For work which will disturb at least 100 linear feet and less than 260 linear feet, or at least 50 square feet and less than 160 square feet, of friable asbestos-containing material, the fee shall be $400.

(3) For work which will disturb at least 260 linear feet and less than 1,000 linear feet, or at least 160 square feet and less than 1,000 square feet, of friable asbestos-containing material, the fee shall be $800.

(4) For work which will disturb 1,000 linear feet or more, or 1,000 square feet or more, of friable asbestos-containing material, the fee shall be $1,200.

(d) Modification of or deviation from the information provided in any notification submitted to the Department of Buildings under this section shall immediately be reported in writing directly to DEP if the change refers to the identity of the building owner or ACM removal contractor or the air monitor­ ing firm; or the amount of ACM to be removed; or the dates of the project; or the specific project location. A notification may be modified no more than twice. A modification is valid only if it is received by the DEP prior to the previously filed date of completion, except for start date changes which must be received one (1) day prior to the original start date. Thereafter, a new notification submitted directly to the department will be required. A notifi­ cation to DEP shall be valid for one year from the date of original filing.

§1-26 Emergency Asbestos Project Notification, (a) An emergency as­ bestos project involves the removal, enclosure or encapsulation of finable asbestos-containing material that was not planned but is undertaken when sudden unexpected event(s) result in a situation tn which any delay in abatement would pose an immediate danger to public safety and health.

(b) When such an emergency asbestos project occurs, immediate telephone notification shall be provided to DEP’s Asbestos Control Division. Telephone notification shall include;

(1) name, affiliation and telephone number of caller;

(2) nature of the emergency;

(3) type of asbestos work to be performed;

(4) exact location of the project including street address and borough;

(5) name, address, and telephone number of the employer of the workers handling the asbestos-containing material; and

C6) starting and projected completion dates.

5737 RCNY 5-31-98

CITY_21MC100_006242958

NYC-WTC_000411827

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000411827Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Asbestos sampling chain of custody form

NYC-WTC_000233286

Chain of custody form for asbestos samples referencing New York State Department of Labor regulations and sample tracking details.

Similar indexed content

Compare copies and versions →