NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 75 pages

RCNY Chapter 1 asbestos regulations, 1998

Machine-extracted title · confidence 38%

COSH-related NYC RO regulatory chapter on asbestos control.

NYC-WTC_000411802–000411876
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

§1-27 TITLE 15—DEPT. OF ENVIRONMENTAL PROTECTION

(c) Written notification must be received as soon as possible, but not later than 48 hours after the project begins, at the DEP’s Bureau of Air Resources’ Asbestos Control Division. Written notification shall be via the Asbestos Inspection Report (Form APC 7) with a cover letter stating:

(1) “This is notification for an emergency asbestos project”; and

(2) The nature of the emergency.

§1-27 Record Keeping Requirements for Investigators, (a) The asbestos investigator shall maintain a permanent record as required under this section for every building survey/hazard assessment for asbestos that is conducted pursuant to or submitted in accordance with §§1-22 through 1-27 of this chapter.

(b) For each building survey/hazard assessment conducted prior to prepa­ ration of either DEP Forms ACP7 or ACP5, the investigator shall compile a record which shall include at a minimum:

(1) a detailed written description of procedures employed to detect the presence or absence of ACM; and

(2) a blueprint, diagram, drawing, or written description of each build­ ing or portion thereof inspected by the investigator that identifies clearly each location and approximate linear or square footage of any area where material was sampled for ACM, and the exact locations where bulk samples were collected, the date of collection, and location of any areas assumed to have ACM; and (3) the printed name and signature of any and all persons who collect^ bulk samples for the purpose of determining the presence ofACM, the name and address of the laboratory analyzing the samples, the date of analysis, the results of the analysis, the method of analysis and the name and signature of the person performing the analysis; and

(4) a detailed written description of any proposed demolition, renova­ tion, alteration or modification work to be performed, including the tech­ niques to be used and a description of affected facility components.

(c) The investigator shall indicate in each record all instances in which work was performed by a non-certified individual pursuant to §l-16(a)(2), and shall include such individual’s name, address, telephone number, and a specific description of all activities performed by such individual.

(d) The investigator shall maintain these records for thirty (30) years.

(e) The investigator shall make these records available during normal business hours without cost or restriction for inspection by a representative of the Department.

5738 RCNY 5-31-9S

"I... CITY_21MC100_006242959

NYC-WTC_000411828

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000411828Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Asbestos sampling chain of custody form

NYC-WTC_000233286

Chain of custody form for asbestos samples referencing New York State Department of Labor regulations and sample tracking details.

Similar indexed content

Compare copies and versions →