Project worksheet, PS 89 air monitoring, 2002

Machine-extracted title · confidence 38%

FEMA project worksheet listing testing details for PS 89 interior and exterior air quality.

NYC-WTC_000411672–000411673
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

; [ -Parameter ' • ; - I Target Level Agency or Organization , . ( Temperature (T) I Summer; 73-79 degrees at 50% RH ( ASHRAE 55 ‘ Winter; 68-75 degrees at 50% RH j I Relative Humidity (RH) 30-60% ASHRAE 55 I I Carbon Dioxide (CO2) <700 parts per million (ppm) above ASHRAE 62 background level Carbon Monoxide 9 ppm USEPA NPAAQS (as sited in ASHRAE 62)___________________________ Total Volatile Organic Compounds 1 ppm AIHA (TVOC)______________________ Re.spirable Particulates (PM 25) 65 micrograms per cubic meter of air ' USEPA NPAAQS-G for general population; 40 i micrograms per cubic meter of air USEPA which is recommended for sensitive individuals and children Ji USEPA= United States Environmental Protection Agency NPAAQS= National Primary Ambient-Air Quality Standard : AIHA= American Industrial Hygiene Association I .ASHRAE= American Society of Heating, Refrigerating, and Air Conditioning Engineers

Contract Costs

The total contract cost from September 12, 2001 to February 28, 2002 is estimated to be $60,571.52. A letter of explanation from the vendor and specific information pertaining to the ambient air sampling completed at PS 89 is attached to this PW. Uie following information from the applicant and the applicant’s vendor was used to compute the total eligible cost;

The eligible costs incurred from September 12, 2001 to February 11, 2002= $40,000.00

Given cost of services= $80,000 (see attached sheet) Divided by two because PS 89 is co-Iocated with IS 89 $80,000.00 X .50= $40,000.00

i j The eligible costs incurred from February 12, 2002 to February 28, 2002= $20,571.52

$18,000.00 X .50= $9,000.00 per week= $1,285.72 per day $1,285.72 X 16 days= $20,571.52

The total eligible costs incurred from September 12, 2001 to February 2S, 2002= $60,571.52

$40,000.00 + $20,571.52= $60,571.52

Prepared By: Matt Talley, Project Officer FIMA Form 90-91 (BACK), .Sep 98

CONFIDENTIAL INSURANCE INFORMATION, CITY_21MC100_007970141 SUBJECT TO PROTECTIVE ORDER NO. 2, SEPT. 2008

NYC-WTC_000411673

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000411673Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →