NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 1 page

FEMA Project Worksheet, disaster NY 2002

Machine-extracted title · confidence 55%

FEMA project worksheet for NY disaster with cost estimates and CFR references.

NYC-WTC_000411637
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

FEDERAL EMERGENCY MANAGEMENT AGENCY o w e No 3067-0151 PROJECT WORKSHEET - Narrative Sheet Expires April 30, 2001

declaration no PROJECT NO FIPS NO I ^T E I CATEGORY FEMA- 1391 -DR- N'v C6i-5^000-22 t 04.15/02 applicant COUNTY New York City, Board of Education New York NAFIPA TiVE

More (han 200,000 Ions of steel and 425.000 cubic yards cf concrete were used m the construction of the WTC complex One WTC (Nonh Tower I was completed in December of 1970 and Two WTC (South Tower j was completed m January o' 1972 The federal regulations restricting the use of asbeslos in concrele and other construction material began to be enforced m the early 1570'e Although asbeslos gives concrele a much higher lensile strength, asbestos fibers are known to have caused such diseases as Asbestosis and Mesothelioma, as well as lung cancer, when mhaied These asbestos fibers are most tiazardous wheni they are m a friable or pulverized slate

The U S Environmental Protection Agency (ERA) • Asbestes Pazarc Emergency Response Act (AHERA). Section 206 of Toxic Substance Coniot Act i.TSCAl states (het its lege function is tc provioe lor the esiabf'Shmeni of Federal regulations whict require inspection to.- asbestos-containing material and tmplemenianon of appropnaie response actions with respect (c asDestos-containing materia m the Nation's schools m a sale anc complete manner anc to mandate safe and complete periodic remspeciion cf school buildings following response actions where appropriate A memorandum horn R Radhakrsnnen P.E from the City of New York. 1 Depahnient of Environmental Prelection, dated September 14. 2001 .gave guidance to building owners on procedures for ciean-up of asbestos containing materials (see attached document. This merr.orandum and the U S Envuomneniai Proiechon Agency (EPA; • Asbestos Hazard Emergency Response Act (AHERA). Section 206 of (he Toxic Substance Control Act iTSCAi were used I as a tasis for me necessary procedures to be perlormec at each school I

School Construction Authority fSCAl School Construction Authority was resDOnsiOte for the coordinahcn and construction management of the contractors ori behalf of BoE The School Construction Authority (SCA) acts on behalf of tne New York Board of Education (BoE) to manage all major constfuciion, repairs, rehabilitation and clean up of ali New York Chy schools Costs associated with the work performed by SCA consists of regu ar time labor ($2,139.05). including the New York City regular time fringe benefii rate lor non-uniform employees of 44.66% ($955 30) Total incurred cost lor regular time labor is $3,094.35 Costs associated with the ovenime lor labor for SCA ($6.030 13) ir^ciuding the New York City overtime fringe benefit Idle 1ui iioifurriform employees 01 W/3Yo ($64/U4j Total incurred cost for overtime labor is $6,677 17

Air Tech Lab, Inc, Air Tech Lab, me conOucled inienor clean up al PS/lS 89 from January 3 to January 10 2002 “his cleanup work consisted Of an inter^sive dean up of visible Ousi utilizing wet wipe methods and HEPA vacuumed the 1st. 2nd, 3rd, 4th. end 5th floors end the 6th flocr mechanical and boiler room Clean-up performed by KISS Construction cost $448,999 74 Invoice from An Tech Lab is included m "Back Up Do No; Scan"

V .& R Mechanical Inc, V & R Mechanical was retamec by SCA to clean the HVAC system m PS'lS 89 This was performed to lemove all dust anc debris potentially contaminated with asbestos and to prevent asbestos containing material to spread throughout the building All work performed under this conliacf was m accordance to the National Ati Duct Cleaning Association INADCA) Standard 92-01 Cosis associated with HVAC cleaning performed by V & R total $385,000,00 in addition, costs were also incurred for the lanor ano malerials required to remove and re-instali existing wall unit veniilaiors m order to adequately clean the system ($70,000) and tc remove existing insulation impacted by dust and debris and replace with new insulation ($7.SCX3) Total costs associated With the wor^ pedormeo by V & H is $463,500 OC invoice from V S R is included m "Back Up Do Not Scan"

Corinthian Con str yet ion Corinthian Construction was leiained to remove alt oeorts ana Ousl from the exterior facade cf the building, courtyards and playgrounds The exterior facade cf n»e building included all masonry and windows )r addit;on. the dust an debris that accumulated m the courtyaros ana on the playground was power washed Cleaning to the facade of the building courtyards and playground conducted by Connihian, cost $231.500 00 invoice tiom Connlhian is included in 'Back Up Do Not scar"

In addition Ccnnihian also performed dean up of the roof of ®S/IS 89 Because cf the fine particjiate of the dust, all stones anc insulation were removed from the roof to expose (he roof membrane Tne roof membrane was washed (horoughiv ot all oust ano OePri:- ami riew nsia‘iat<or. Mier fabric and stone were replaced tn it? state prior to the event Crsts ascciaieC with this work total $68 640

Iri aOGition Connihiar inspected ana repaired previously damaged areas including ttie membrane ^lashings and pitch pockets Pape 53 of FEMAY Public Ass stance Guide slates that 'only repairs to disaster-related damage are eligible' Tnese damages were not a direct result of Hie collapse of WTC. and theretore, the inspection and repair of these damaqes are not eligible lor fund nq Cy FEMA Ineligible costs associated with the inspection a'ld lepau cl the pre-ex»siing damages total $3 860

Tola costs ricurred 'rom services provided by Curinthian is SJOOl'IC

New York 6nyirgnrrieniaI During the dean-up and remediation project at PS/iS 89, New York Envnorirnenial was retained to conduct quality control asbestos project monitoring and analytical services. The transmission electron microscopy {TEW; samples were collected m the same locations as the samples be mg collected by ATC Associates These samples were then analyzed by Atnenica Environments! Services, me Sampling and analysis was performed in accorcancc to AHERA regulation Oualitv control air monitoring and analytical services provided Dy New York Environmental lotaied $3.79? SO

ATC Associates. Inc ATC Associaies mori-iored (he clean up activities al PS/IS 89 ano upon satisfactory visua inspection, collected prase coniresi minrcr r.op, (PCM i following all applicable Federal State anc New '^ork Chy rules and legulations A final inspection was penormeo using aggressive an sampling in conformance with the methoOoiogv ot the AHERA Firai Rule<40 CFR Parr 753, The samples were anaivred 'at transmission election microscopy (TEM) Work penormen hy ATC total $28 105

TDK Construction C^OL»1ifih The TL X Consbuction Corporat'cn was retained Dy SCA to perlorm consuuct’on management ano oversight duties at F'E. IE 89 ic coofdif-aif ’he coiitii^Ltua' au-nes ana lo insure that work perlormec Dv contracio's mei (he proposed scope o‘ work and professiona' nuaiitv tDx was also responsible to msuie ma; me wen- rerforp--ea adneieu to aopi'caaie 'equianon;. . ass( si.-mc w'N -i.nirucucn management anc msoecticn bv tdx miaic-d $54 2~3

D?nie, Wanui ^-loiec Of!i FEMA form SC-91A SEP 9fc.

CONFIDENTIAL INSURANCE INFORMATION, CITY_21MC100_007969777

SUBJECT TO PROTECTIVE ORDER NO. 2, SEPT. 2008

NYC-WTC_000411637

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000411637Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

FEMA Project Worksheet · page 2

NYC-WTC_000251589

FEMA project worksheet and paperwork burden disclosure for disaster-related work.

Similarity score 0.973 (not a probability)

machine-extracted · confidence unavailable · Check page ↗

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000251589

FEMA project worksheet and paperwork burden disclosure for disaster-related work.

Similar indexed content

NYC-WTC_000243504

FEMA declaration/project worksheet for WTC asbestos regulations and materials.

Similar indexed content

Compare copies and versions →