NYC-WTC_000388927
Formal project scope and scope items for WTC Recovery works by JCC Construction.
1 shared non-person entities · 1 shared topics · similarity 0.998
machine-extracted · confidence unavailable · Check page ↗Contract proposal from JCC Construction for WTC Recovery project refurbishment works.
NYC-WTC_000388924–000388926OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
Scope of Work
• Remove and replace sand in playground area Removal by use of vacuum truck (See note A below) • Remove and replace sand in volleyball court area Removal by use of vacuum truck (See note A below) • Remove top 6” of soil in bocce court area Removal by use of bobcat (See note A below) • Remove putting greens in miniature golf area Power wash entire area • Replace damaged railing along Pier 25 Remove and replace all wood top handrails 500 If Power wash entire railing along pier Repair damaged curb as needed • Excavate and remove temporary asphalt roadway Excavate and remove all gravel under temporary roadway Excavate and remove of soil beneath gravel to elevation equal to bottom of the adjacent paving stone (Between N Moore St and School) (See note A below) • Remove, cut and plug existing temporary drainage within the temporary roadway • Remove debris, patch as needed and power wash temporary bide path Paint lines as required to match the existing bike pa (between N Moore St and School) (See note A below) • Bid to include any temporary barricades, railing or fencing that may be necessary to complete the required work Shall include any flagmen that may be required • Power wash new stone wall along bike path Paving stone to remain in place • Note A All debris and sand being removed shall be coordinated with Weeks Manne for loading up and removal via barge This removal work to take place during the week following the last truckload from the WTC Recovery Site Tentatively the last load is scheduled for 5/11/02, therefore removal to take place between 5/12/02 and 5/17/02 (date of crane being demobilized from Pier 25) • All repair and replacement work to occur following the demobilization of the crane (5/17/02) from Pier 25 All repair/replacement work to be complete by June 7, 2002 • Working hours at pier 25 are between 7am and 7pm • Contractor to enroll in NYCDDC OCEP program with Liberty Mutual insurance • No sales tax to be included in the proposal
TOTAL COST TO PERFORM THE WORK ENUMERATED ABOVE $572,000 00
CITY_21MC100_008102601
NYC-WTC_000388926
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000388927
Formal project scope and scope items for WTC Recovery works by JCC Construction.
1 shared non-person entities · 1 shared topics · similarity 0.998
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388930
Proposed scope of maintenance work at World Trade Center site areas, including playgrounds, courts, railing, and roadway.
1 shared non-person entities · 1 shared topics · similarity 0.998
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000251947
Proposal detailing tasks for WTC Recovery including soil, sand removal, and railing repairs.
1 shared non-person entities · 1 shared topics · similarity 0.996
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000281321
Proposal to furnish materials and labor for site work at World Trade Center recovery.
1 shared non-person entities · 1 shared topics · similarity 0.996
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280179
Project scope for restoration tasks at World Trade Center site, including sand replacement and railing work.
1 shared non-person entities · 1 shared topics · similarity 0.995
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000208642
Proposal by JCC Construction Corp to remove contaminated soil and repair playground and pier facilities at the World Trade Center site.
1 shared non-person entities · 1 shared topics · similarity 0.994
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000356664
Document proposing scope of works for WTC site including sand replacement and railing repair.
1 shared non-person entities · 1 shared topics · similarity 0.994
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000356814
Project scope for playground, court, roofing, railing, and roadway work at WTC site.
1 shared non-person entities · 1 shared topics · similarity 0.993
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000267055
Scope of work for playground, sand, soil removal, railing, and other sitework at WTC site.
1 shared non-person entities · 1 shared topics · similarity 0.993
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000339636
Form detailing proposed work at WTC site: playground sand, soil removal, railing replacement, and other repairs.
1 shared non-person entities · 1 shared topics · similarity 0.993
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000251956
Proposal to furnish materials and labor for site improvements at World Trade Center Recovery project (play areas, railing, surfaces).
1 shared non-person entities · 1 shared topics · similarity 0.993
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280176
Formal proposal for materials and labor to World Trade Center recovery areas (playground, etc.).
1 shared non-person entities · 1 shared topics · similarity 0.991
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000388927
Formal project scope and scope items for WTC Recovery works by JCC Construction.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388930
Proposed scope of maintenance work at World Trade Center site areas, including playgrounds, courts, railing, and roadway.
Similarity score 0.999 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000356664
Document proposing scope of works for WTC site including sand replacement and railing repair.
Similarity score 0.996 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000208642
Proposal by JCC Construction Corp to remove contaminated soil and repair playground and pier facilities at the World Trade Center site.
Similarity score 0.996 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280179
Project scope for restoration tasks at World Trade Center site, including sand replacement and railing work.
Similarity score 0.996 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000267055
Scope of work for playground, sand, soil removal, railing, and other sitework at WTC site.
Similarity score 0.995 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000388927
Formal project scope and scope items for WTC Recovery works by JCC Construction.
Similar indexed content
NYC-WTC_000388930
Proposed scope of maintenance work at World Trade Center site areas, including playgrounds, courts, railing, and roadway.
Similar indexed content
Proposal detailing tasks for WTC Recovery including soil, sand removal, and railing repairs.
Similar indexed content
NYC-WTC_000281321
Proposal to furnish materials and labor for site work at World Trade Center recovery.
Similar indexed content
NYC-WTC_000280179
Project scope for restoration tasks at World Trade Center site, including sand replacement and railing work.
Similar indexed content