Proposal for WTC Recovery project

Machine-extracted title · confidence 41%

Contract proposal from JCC Construction for WTC Recovery project refurbishment works.

NYC-WTC_000388924–000388926
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

GENERAL EXCEPTIONS: RE: ALL WORK REQUIRING STREET EXCAVATIONS

Due to the possibility ot underground utilities, existmg water mams, pipe lines, liber optic cables, telephone lines, relocation & replacement of existing gas mains, conduit ducts, rock excavation, dewatermg removal of existing soil determined " NOT SUITABLE FOR BACKTILL" by the NYCDOT or NYCDEP and furnishing suitable sod, contaminated sod removal & disposal, etc, we hereby take exception to and accept absolutely no responsibility for the cost of relocating these utilitie and performing any additional work in order to perform the installation required by our contract. We will however, cooperate in every way with the governing utdity to negotiate an amicable means for the; utilities to be relocated by their forces, or by our forces subsequent to an agreed change order in writing prior to beginning any additional work.

Dewatering and rock excavation if required is not included in this proposal and if required will be performed by our forces and paid for on a time and materials basis or another method acceptable to both parties.

In the event a change order is required and can not be negotiated at the time it is discovered and we art required to close up any excavations, there will be an additional charge for remobilization of our forces when an agreed change order has been signed both parties Please be aware the job will not contmue until the additional work authorization is signed

Contractor JCC CONSTRUCTION CORPORATION Contractor Signature Uavia (^annizzaro Print Name & Title David Cannizzaro/President Date

Agreed & Accepted by Print Name & Title Date

CITY_21MC1OO_OO81O26OO

NYC-WTC_000388925

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000388925Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000251947

Proposal detailing tasks for WTC Recovery including soil, sand removal, and railing repairs.

Similar indexed content

Compare copies and versions →