NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 3 pages

Proposal: WTC Recovery project scope and tasks, 2002

Machine-extracted title · confidence 28%

Document proposing scope of works for WTC site including sand replacement and railing repair.

NYC-WTC_000356664–000356666
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Scope of Work

• Remove and replace sand in playground area. Removal by use of vacuum truck. (See note A below) • Remove and replace sand in volleyball court area. Removal by use of vacuum truck. (See note A below) • Remove top 6” of soil in bocce court area. Removal by use of bobcat. (See note A below) • Remove putting greens in miniature golf area. Power wash entire area. • Replace damaged railing along Pier 25. Remove and replace all wood top handrails 500 If. Power wash entire railing along pier. Repair damaged curb as needed. ® Excavate and remove temporary asphalt roadway. Excavate and remove all gravel under temporary roadway. Excavate and remove of soil beneath gravel to elevation equal to bottom of the adjacent paving stone. (Between N. Moore St. and Schoo!) (See note A below) e Remove, cut and plug existing temporary drainage within the temporary roadway. • Remove debris, patch as needed and power wash temporary bide path. Paint lines as required to match the existing bike pa (between N. Moore St. and School) (See note A below) • Bid to include any temporary barricades, railing or fencing that may be necessary to complete the required work. Shall include any flagmen that may be required. s Power wash new stone wall along bike path. Paving stone to remain in place. ® Note A: All debris and sand being removed shall be coordinated with Weeks Marine for loading up and removal via barge. This removal work to take place during the week following the last tmckload from the WTC Recovery Site. Tentatively the last load is scheduled for 5/11/02, therefore removal to take place between 5/12/02 and 5/17/02 (date of crane being demobilized from Pier 25). • All repair and replacement work to occur following the demobilization of the crane (5/17/02) from Pier 25. All repair/replacement work to be complete by June 7, 2002. e Working hours at pier 25 are between 7am and 7pm. • Contractor to enroll in NYCDDC OCIP program with Liberty Mutual insurance. • No sales tax to be included in the proposal.

TOTAL COST TO PERFORM THE WORK ENUMERATED ABOVE $572,000 00

CITY_21MC100_001784209 NYC-WTC_000356666

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000356666Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000251947

Proposal detailing tasks for WTC Recovery including soil, sand removal, and railing repairs.

Similar indexed content

NYC-WTC_000267055

Scope of work for playground, sand, soil removal, railing, and other sitework at WTC site.

Similar indexed content

Compare copies and versions →