NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 3 pages

Proposal: WTC Recovery project scope and tasks, 2002

Machine-extracted title · confidence 28%

Document proposing scope of works for WTC site including sand replacement and railing repair.

NYC-WTC_000356664–000356666
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

• GENERAL EXCEPTIG.,. 3: RE; ALL WORK REQUIRING STREET EXCAVATIONS.

Due to the possibility of underground utilities, existing water mains, pipe lines, liber optic cables, telephone lines, relocation & replacement of existing gas mains, conduit ducts, rock excavation, dewatering removal of existing soil determined " NOT SUITABLE FOR BACKTILL" by the NYCDOT or NYCDEP and furnishing suitable soil, contaminated sod removal & disposal, etc., we hereby take exception to and accept absolutely no responsibility for the cost of relocating these utilitie; and performing any additional work in order to perform the installation required by our contract. We will however, cooperate in every way with the governing utility to negotiate an amicable means for the; utilities to be relocated by their forces, or by our forces subsequent to an agreed change order in writing prior to beginning any additional work.

Dewatering and rock excavation if required is not included in this proposal and if required will be performed by our forces and paid for on a time and materials basis or another method acceptable to both parties.

In the event a change order is required and can not be negotiated at the time it is discovered and we art required to close up any excavations, there will be an additional charge for remobffization of our forces when an agreed change order has been signed both parties.Please be aware the job will not continue until the additional work authorization is signed.

Contractor: JCC CONSTRUCTION CORPORATION Contractor Signature: Jjavia CanniZZaro Print Name & Title: David Cannizzaro/President Date: o//-

Agreed & Accepted by: Print Name & Title: Date:

CITY_21MC100_001784208 NYC-WTC_000356665

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000356665Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000251947

Proposal detailing tasks for WTC Recovery including soil, sand removal, and railing repairs.

Similar indexed content

NYC-WTC_000267055

Scope of work for playground, sand, soil removal, railing, and other sitework at WTC site.

Similar indexed content

Compare copies and versions →