Daily work force report, World Trade Center, Nov 26 day

Machine-extracted title · confidence 41%

Day shift daily workforce for World Trade Center site, November 26, 2001.

NYC-WTC_000388260
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

GRACE CONTRACTING CORP, I ( ' 151-4SBlhRoad, WhllestonB. N.Y. 11357- (710) 73719000 DATE: MONDAY. NOVEMBER 26, 2001 DAY (FINAL)

daily work force report ! Job Name & Location: World Trade Ceiitar

Contract No. i Weather Conditions RAIN EARLY THEN MILD - DARK ___________________________ h___________________ Labor : j Equipment CLASSIFICATION UANTIT Description MANNED STANDBY IDLE SUPERINTENDENT 2 CAT 966 LOADER I 1 ’ WOJECT ENGINEER 1 CAT 446 BACKHOE 1 OFFICE ENGINEER CAT 973 LOADER 1 FOREMEN Xi 1 CAT 365 GRAPPLER 1 SAFETY OFFICER 1 CAT 375 GRAPPLER 1 LABORERS IRON WORKERS ii 20 1 HITACHI 750 GRAPPLER HITACHI 550 GRAPPLER 1 1 LOCAL 14 4 HITACHI 550 GRAPPLER 1 LOCAL 15 9 HITACHI 1200 GRAPPLER : 1 CARPENTER 185 CFM COMPRESSOR 1 CARPENTER FOREMAN 2 MECHANICS TRUCK 2 TEAMSTERS 11 TOOL TRUCK 1 4 MECHANICS 2 TOOL VAN 1 HOUSE WRECKERS ii 4 ROLL OFF DUMP TRAILERS 8 LOW BED TRAILER HIGH DECK TRAILERS 2 WELDING TRUCK 1 A FUEL TRUCK 1 PICKUP TRUCKS 5 LIGHT TOWERS 8 PARTS TRUCK 1 DUMP TRUCKS 10 WHEEL DUMP TRUCK FLASHING ARROW BOARD 1 OFFICE TRAILER 1 CARGO BOXES . 3 FLAT TRUCK 1 PUMP 2 11 85' FOOT GENIE 1 ANGEL AERIAL(DUST SUPR 1 GENERATOR 60KW 1

Description of Work:________________ j________________________________ LOADS OUT: 140__________________ y________________________________ EXCAVATING ALONG WEST SLURRY VVALL SOUTH OF OUR ACCESS ROAD CONTINUED BUIDING RAMP FROM NORTHWEST APPROACH____________ MANNED TARPING AND TRIMMING STATIONS_________________________ MANNED WATER STATIONS FOR DUST CONTROL______________________ MAINTAIN TRAFFIC FLOW IN AND OUT|OF AREA CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF TOWER 2 DELAYS: 1 HR (12:00-1:00) WHILE CREW WENT UNDERGROUND TO INVESTIGATE AREA____________ 3 HOURS WITH GATEWAY 550 & GRAQE 750 AT N/E CORNER OF TOWER 2 CORE WHILE SEARCH AND RECOVERY FOR FIREFIGHTERS WAS CONDUCTED

GRACE CONTRACTING CORP Approved By: Title: BY: For: SUPERINTENDENT

CITY_21MC100_00370102i NYC-WTC_000388260

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000388260Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Daily work force report

NYC-WTC_000388186

Final daily workforce report for World Trade site, Nov 26, 2001.

Similar indexed content