NYC-WTC_000388716
Final day shift workforce and equipment at World Trade Center site, Nov 26, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.996
machine-extracted · confidence unavailable · Check page ↗Workforce and equipment counts for World Trade Center job, Nov 26, 2001.
NYC-WTC_000280072OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
GRACE CONTRACTING CORP. 151^5 6th Road, Whitestone. N.Y 11357-(718) 767-9000 DATE; MONDAY. NOVEMBER 26. 2001 DAY (FINAL)
DAILY WORK FORCE REPORT
Job Name & Location: World Trade Center Contract No. Weather Conditions RAIN EARLY THEN MILD - DARK
Labor II Equipment CLASSIFICATION UANTIT |[I Description MANNED STANDBY IDLE SUPERINTENDENT 2 CAT966 LOADER 1 PROJECT ENGINEER i [CAT 446 BACKHOE 1 OFFICE ENGINEER CAT 973 LOADER 1 FOREMEN___________ 1 CAT 365 GRAPPLER 1 SAFETY OFFICER 1 CAT375GRAPPLER 1 LABORERS__________ 20 HITACHI 750 GRAPPLER 1 IRON WORKERS 1 HITACHI 550 GRAPPLER 1 LOCAL 14____________ 4 HITACHI 550 GRAPPLER 1 LOCAL 15 9 HITACH11200 GRAPPLER 1 CARPENTER 185 CFM COMPRESSOR 1 CARPENTER FOREMAN 2 MECHANICS TRUCK 2 TEAMSTERS 11 TOOL TRUCK 1 MECHANICS 2 TOOL VAN 1 HOUSE WRECKERS 4 1 ROLL OFF ~ [DUMP TRAILERS 8 1|lOW BED TRAILER 1 HIGH DECK TRAILERS ~ 2 1 WELDING TRUCK 1 1FUELTRUCK 1 1 PICKUP TRUCKS ~ 5 LIGHT TOWERS 8 PARTS TRUCK 1 DUMP TRUCKS 10 WHEEL DUMP TRUCK FLASHING ARROW BOARD 1 OFFICE TRAILER 1 CARGO BOXES 3 IFLAT TRUCK ~ 1 [PUMP ~ 2 l eg FOOT GENIE ~ 1 IUngel AERIAL(DUST SUPR 1 I GENERATOR 60KW 1
Description of Work:_______________________________________________________________________ LOADS OUT: 140_________________________________________________________________________ EXCAVATING ALONG WEST SLURRY WALL SOUTH OF OUR ACCESS ROAD_______________________ CONTINUED BUIDING RAMP FROM NORTHWEST APPROACH___________________________________ MANNED TARPING AND TRIMMING STATIONS________________________________________________ MANNED WATER STATIONS FOR DUST CONTROL MAINTAIN TRAFFIC FLOW IN AND OUT OF AREA CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF TOWER 2_____________________________ DELAYS: 1 HR (12:00-1:00) WHILE CREW WENT UNDERGROUND TO INVESTIGATE AREA 3 HOURS WITH GATEWAY 550 & GRACE 750 AT N/E CORNER OF TOWER 2 CORE WHILE SEARCH AND RECOVERY FOR FIREFIGHTERS WAS CONDUCTED
GRACE CONTRACTING CORP Approved By; Title: BY: For; SUPERINTENDENT
CITY_21MC100_004484364
NYC-WTC_000280072
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000388716
Final day shift workforce and equipment at World Trade Center site, Nov 26, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.996
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000419094
Final daily workforce report for World Trade Center construction, Grace Contracting, Nov 26, 2001 (Day).
2 shared non-person entities · 1 shared topics · similarity 0.994
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305433
Daily labor and equipment roster for World Trade Center site, November 26, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.993
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000302422
Night shift daily workforce report for World Trade Center project with equipment list.
2 shared non-person entities · 1 shared topics · similarity 0.993
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000389393
Daily workforce report for World Trade project, listing personnel and equipment.
2 shared non-person entities · 1 shared topics · similarity 0.993
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305580
Night shift daily workforce and equipment at World Trade site, Dec 1, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388353
Daily workforce report with crew counts and equipment at World Trade during Nov 2001.
2 shared non-person entities · 1 shared topics · similarity 0.991
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000291273
Day final daily workforce report for World Trade Center project, Nov 25, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.988
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305588
Night shift daily workforce and equipment at World Trade site, Nov 30, 2001.
1 shared non-person entities · 1 shared topics · similarity 0.986
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000429685
Day shift labor and equipment details for World Trade Center project.
2 shared non-person entities · 1 shared topics · similarity 0.985
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000279727
Day shift workforce and equipment counts for World Trade Center, Nov 28, 2001.
3 shared non-person entities · 1 shared topics · similarity 0.985
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305431
Daily labor and equipment roster for World Trade Center site, November 25, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.984
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000388716
Final day shift workforce and equipment at World Trade Center site, Nov 26, 2001.
Similarity score 0.998 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000419094
Final daily workforce report for World Trade Center construction, Grace Contracting, Nov 26, 2001 (Day).
Similarity score 0.997 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305433
Daily labor and equipment roster for World Trade Center site, November 26, 2001.
Similarity score 0.997 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000302422
Night shift daily workforce report for World Trade Center project with equipment list.
Similarity score 0.996 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000389393
Daily workforce report for World Trade project, listing personnel and equipment.
Similarity score 0.996 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305580
Night shift daily workforce and equipment at World Trade site, Dec 1, 2001.
Similarity score 0.996 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000388716
Final day shift workforce and equipment at World Trade Center site, Nov 26, 2001.
Similar indexed content
NYC-WTC_000419094
Final daily workforce report for World Trade Center construction, Grace Contracting, Nov 26, 2001 (Day).
Similar indexed content
NYC-WTC_000305433
Daily labor and equipment roster for World Trade Center site, November 26, 2001.
Similar indexed content
NYC-WTC_000302422
Night shift daily workforce report for World Trade Center project with equipment list.
Similar indexed content
NYC-WTC_000389393
Daily workforce report for World Trade project, listing personnel and equipment.
Similar indexed content