Final day shift workforce and equipment at World Trade Center site, Nov 26, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.996
machine-extracted · confidence unavailable · Check page ↗Final daily workforce report for World Trade Center construction, Grace Contracting, Nov 26, 2001 (Day).
NYC-WTC_000419094OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
GRACE CONTRACTING CORP. 151-45 etti Road, Whitestone, N.Y. 11357-(718) 767-9000 DATE; MONDAY, NOVEMBER 26, 2001 DAY (FINAL)
DAILY WORK FORCE REPORT
Job Name & Location; World Trade Center Contract No. Weather Conditions RAIN EARLY THEN MILD - DARK
Labor Equipment CLASSIFICATION UANTIT Description [MANNED STANDBY IDLE SUPERINTENDENT 2 CAT 966 LOADER i PROJECT ENGINEER 1 CAT 446 BACKHOE 1 OFFICE ENGINEER CAT 973 LOADER 1 FOREMEN___________ 1 CAT 365 GRAPPLER 1 SAFETY OFFICER 1 CAT 375 GRAPPLER 1 LABORERS 20 HITACHI 750 GRAPPLER 1 IRON WORKERS 1 HITACHI 550 GRAPPLER 1 LOCAL 14 4 HITACHI 550 GRAPPLER 1 LOCAL 15 9 HITACHI 1200 GRAPPLER 1 CARPENTER 185 CFM COMPRESSOR . 1 CARPENTER FOREMAN 2 MECHANICS TRUCK 2 TEAMSTERS 11 TOOL TRUCK 1 MECHANICS 2 TOOL VAN 1 HOUSE WRECKERS 4 ROLL OFF DUMP TRAILERS 8 LOW BED TRAILER HIGH DECK TRAILERS 2 WELDING TRUCK 1 FUEL TRUCK 1 PICKUP TRUCKS 5 LIGHT TOWERS 8 PARTS TRUCK 1 DUMP TRUCKS 10 WHEEL DUMP TRUCK FLASHING ARROW BOARD 1 OFFICE TRAILER 1 CARGO BOXES 3 FLAT TRUCK 1 PUMP 2 85' FOOT GENIE 1 ANGEL AERIAL(DUST SUPR 1 GENERATOR 60KW 1
Description of Work; LOADS OUT: 140_________________________________________________________________________ EXCAVATING ALONG WEST SLURRY WALL SOUTH OF OUR ACCESS ROAD_______________________ CONTINUED BUIDING RAMP FROM NORTHWEST APPROACH___________________________________ MANNED TARPING AND TRIMMING STATIONS________________________________________________ MANNED WATER STATIONS FOR DUST CONTROL_____________________________________________ MAINTAIN TRAFFIC FLOW IN AND OUT OF AREA______________________________________________ CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF TOWER 2 DELAYS: 1 HR (12:00-1:00) WHILE CREW WENT UNDERGROUND TO INVESTIGATE AREA____________ 3 HOURS WITH GATEWAY 550 & GRACE 750 AT N/E CORNER OF TOWER 2 CORE WHILE SEARCH AND RECOVERY FOR FIREFIGHTERS WAS CONDUCTED I
GRACE CONTRACTING CORP Approved By; Title; BY: For; SUPERINTENDENT Q1.3QQ392
CITY_21MC100_001069495 NYC-WTC_000419094
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000388716
Final day shift workforce and equipment at World Trade Center site, Nov 26, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.996
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000389393
Daily workforce report for World Trade project, listing personnel and equipment.
2 shared non-person entities · 1 shared topics · similarity 0.995
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280072
Workforce and equipment counts for World Trade Center job, Nov 26, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.994
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000302422
Night shift daily workforce report for World Trade Center project with equipment list.
2 shared non-person entities · 1 shared topics · similarity 0.994
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305580
Night shift daily workforce and equipment at World Trade site, Dec 1, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.994
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305433
Daily labor and equipment roster for World Trade Center site, November 26, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.993
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388353
Daily workforce report with crew counts and equipment at World Trade during Nov 2001.
2 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000291273
Day final daily workforce report for World Trade Center project, Nov 25, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.988
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000419092
Final daily workforce report for World Trade Center construction, Grace Contracting, Nov 25, 2001 (Day).
2 shared non-person entities · 1 shared topics · similarity 0.988
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000279728
Night shift workforce/equipment summary for World Trade Center, Nov 28, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.988
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305588
Night shift daily workforce and equipment at World Trade site, Nov 30, 2001.
1 shared non-person entities · 1 shared topics · similarity 0.988
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305431
Daily labor and equipment roster for World Trade Center site, November 25, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.988
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000388716
Final day shift workforce and equipment at World Trade Center site, Nov 26, 2001.
Similarity score 0.998 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000389393
Daily workforce report for World Trade project, listing personnel and equipment.
Similarity score 0.998 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280072
Workforce and equipment counts for World Trade Center job, Nov 26, 2001.
Similarity score 0.997 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000302422
Night shift daily workforce report for World Trade Center project with equipment list.
Similarity score 0.997 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305580
Night shift daily workforce and equipment at World Trade site, Dec 1, 2001.
Similarity score 0.997 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305433
Daily labor and equipment roster for World Trade Center site, November 26, 2001.
Similarity score 0.996 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000388716
Final day shift workforce and equipment at World Trade Center site, Nov 26, 2001.
Similar indexed content
NYC-WTC_000389393
Daily workforce report for World Trade project, listing personnel and equipment.
Similar indexed content
NYC-WTC_000280072
Workforce and equipment counts for World Trade Center job, Nov 26, 2001.
Similar indexed content
NYC-WTC_000302422
Night shift daily workforce report for World Trade Center project with equipment list.