NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 1 page

Daily work force report, World Trade Center

Machine-extracted title · confidence 28%

Final daily workforce report for World Trade Center construction, Grace Contracting, Nov 26, 2001 (Day).

NYC-WTC_000419094
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

GRACE CONTRACTING CORP. 151-45 etti Road, Whitestone, N.Y. 11357-(718) 767-9000 DATE; MONDAY, NOVEMBER 26, 2001 DAY (FINAL)

DAILY WORK FORCE REPORT

Job Name & Location; World Trade Center Contract No. Weather Conditions RAIN EARLY THEN MILD - DARK

Labor Equipment CLASSIFICATION UANTIT Description [MANNED STANDBY IDLE SUPERINTENDENT 2 CAT 966 LOADER i PROJECT ENGINEER 1 CAT 446 BACKHOE 1 OFFICE ENGINEER CAT 973 LOADER 1 FOREMEN___________ 1 CAT 365 GRAPPLER 1 SAFETY OFFICER 1 CAT 375 GRAPPLER 1 LABORERS 20 HITACHI 750 GRAPPLER 1 IRON WORKERS 1 HITACHI 550 GRAPPLER 1 LOCAL 14 4 HITACHI 550 GRAPPLER 1 LOCAL 15 9 HITACHI 1200 GRAPPLER 1 CARPENTER 185 CFM COMPRESSOR . 1 CARPENTER FOREMAN 2 MECHANICS TRUCK 2 TEAMSTERS 11 TOOL TRUCK 1 MECHANICS 2 TOOL VAN 1 HOUSE WRECKERS 4 ROLL OFF DUMP TRAILERS 8 LOW BED TRAILER HIGH DECK TRAILERS 2 WELDING TRUCK 1 FUEL TRUCK 1 PICKUP TRUCKS 5 LIGHT TOWERS 8 PARTS TRUCK 1 DUMP TRUCKS 10 WHEEL DUMP TRUCK FLASHING ARROW BOARD 1 OFFICE TRAILER 1 CARGO BOXES 3 FLAT TRUCK 1 PUMP 2 85' FOOT GENIE 1 ANGEL AERIAL(DUST SUPR 1 GENERATOR 60KW 1

Description of Work; LOADS OUT: 140_________________________________________________________________________ EXCAVATING ALONG WEST SLURRY WALL SOUTH OF OUR ACCESS ROAD_______________________ CONTINUED BUIDING RAMP FROM NORTHWEST APPROACH___________________________________ MANNED TARPING AND TRIMMING STATIONS________________________________________________ MANNED WATER STATIONS FOR DUST CONTROL_____________________________________________ MAINTAIN TRAFFIC FLOW IN AND OUT OF AREA______________________________________________ CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF TOWER 2 DELAYS: 1 HR (12:00-1:00) WHILE CREW WENT UNDERGROUND TO INVESTIGATE AREA____________ 3 HOURS WITH GATEWAY 550 & GRACE 750 AT N/E CORNER OF TOWER 2 CORE WHILE SEARCH AND RECOVERY FOR FIREFIGHTERS WAS CONDUCTED I

GRACE CONTRACTING CORP Approved By; Title; BY: For; SUPERINTENDENT Q1.3QQ392

CITY_21MC100_001069495 NYC-WTC_000419094

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000419094Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →