NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 1 page

Daily workforce report, World Trade Center, Nov 26, 2001

Machine-extracted title · confidence 42%

Daily workforce and equipment details for World Trade Center project, Nov 26, 2001.

NYC-WTC_000429706
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

GRACE CONTRACTING CORP. 151-45 6th Road, Whitestone, N.Y, 11357-(71B) 767)9000 DATE; MONDAY, NOVEMBER 26, 2001 DAY (FINAL)

DAILY WORK FORCE REPORT

I Job Name & Location: World Trade Ceriter Contract No. Weather Conditions RAIN EARLY THEN MILD - DARK

Labor Equipment CLASSIFICATION UANTIT Description MANNED STANDBY TlLEj SUPERINTENDENT 2 CAT 966 LOADER 1 PROJECT ENGINEER 1 CAT 446 BACKHOE 1 OFFICE ENGINEER CAT 973 LOADER 1 [FOREMEN____________ 1 CAT 365 GRAPPLER 1 SAFETY OFFICER 1 CAT 375 GRAPPLER 1 LABORERS 20 HITACHI 750 GRAPPLER 1 IRON WORKERS 1 HITACHI 550 GRAPPLER 1 LOCAL 14 4 HITACHI 550 GRAPPLER I 1 LOCAL 15 9 HITACHI 1200 GRAPPLER 1 CARPENTER 185 CFM COMPRESSOR ; 1 CARPENTER FOREMAN 2 MECHANICS TRUCK 2 TEAMSTERS 11 TOOL TRUCK 1 MECHANICS 2 TOOL VAN 1 HOUSE WRECKERS 4 ROLLOFF DUMP TRAILERS 8 LOW BED TRAILER HIGH DECK TRAILERS 2 WELDING TRUCK 1 FUEL TRUCK 1 PICKUP TRUCKS 5 LIGHT TOWERS 8 PARTS TRUCK 1 DUMP TRUCKS 10 WHEEL DUMP TRUCK FLASHING ARROW BOARD 1 OFFICE TRAILER 1 CARGO BOXES 3 FLAT TRUCK 1 PUMP 2 85' FOOT GENIE 1 ANGEL AERIAL(DUST SUPR 1 GENERATOR 60KW 1

Description of Work; ; LOADS OUT; 140___________________ i____________________ ______________________ j____________ EXCAVATING ALONG WEST SLURRY WALL SOUTH OF OUR ACCESS ROAD___________ _ CONTINUED BUIDING RAMP FROM NORTHWEST APPROACH_______________________ ____________ MANNED TARPING AND TRIMMING STATIONS MANNED WATER STATIONS FOR DUST CONTROL________________________________ ____________ MAINTAIN TRAFFIC FLOW IN AND OUT OF AREA CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF TOWER 2_________________ DELAYS; 1 HR (12;QQ-1-.OO) WHILE CREW WENT UNDERGROUND TO INVESTIGATE AREA 3 HOURS WITH GATEWAY 550 & GRACE 750 AT N/E CORNER OF TOWER 2 CORE WHILEiSEARCH AND RECOVERY FOR FIREFIGHTERS WAS CONDUCTED

GRACE CONTRACTING CORP Approved By; Tide; BY: For; SUPERINTENDENT

CITy_21MC100_004144418

NYC-WTC_000429706

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000429706Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →