Daily work force report

Machine-extracted title · confidence 28%

Final daily workforce report for World Trade site, Nov 26, 2001.

NYC-WTC_000388186
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

GRACE CONTRACTING CORP. ] 1S1-46 6lh Road. Whlleslona. N Y. 11357.(718)767 9000 DATE: MONDAY, NOVEMBER 26. 200,1 DAY (FINAL)

daily work force report )

Job Name & Location: World Trade Certter Contract No. j Weather Conditions RAIN EARLY THEN MILD - DARK ______________________ L_______ Labor i ___________ Equipment : CLASSIFICATION UANTIT Description ; MANNED STANDBY IDLE SUPERINTENDENT 2 CAT 966 LOADER T 1 PROJECT ENGINEER 1 CAT 446 BACKHOE i OFFICE ENGINEER CAT 973 LOADER 1 FOREMEN 1 CAT 365 GRAPPLER 1 SAFETY OFFICER 1 CAT 375 GRAPPLER 1 LABORERS 20 HITACHI 750 GRAPPLER ; 1 IRON WORKERS 1 HITACHI 550 GRAPPLER ! 1 LOCAL 14 4 HITACHI 550 GRAPPLER 1 1 LOCAL 15 9 HITACH11200 GRAPPLER j 1 CARPENTER 185 CFM COMPRESSOR I 1 CARPENTER FOREMAN 2 MECHANICS TRUCK ; 2 TEAMSTERS__________ 11 TOOL TRUCK 1 MECHANICS 2 TOOL VAN 1 HOUSE WRECKERS 4 ROLL OFF DUMP TRAILERS 8 LOW BED TRAILER HIGH DECK TRAILERS 2 WELDING TRUCK 1 FUEL TRUCK 1 PICKUP TRUCKS 5 LIGHT TOWERS 8 PARTS TRUCK 1 DUMP TRUCKS 10 WHEEL DUMP TRUCK FLASHING ARROW BOARD 1 OFFICE TRAILER 1 CARGO BOXES 3 FLAT TRUCK 1 PUMP 2 85' FOOT GENIE 1 ANGEL AERIAL(DUST SUP.R 1 GENERATOR 60KW 1 ( I sss Description of Work:_________________ i___________________________________________ ;____________ LOADS OUT: 140 , EXCAVATING ALONG WEST SLURRY WALL SOUTH OF OUR ACCESS ROAD ; CONTINUED BUIDING RAMP FROM NORTHWEST APPROACH_______________________ MANNED TAPPING AND TRIMMING STATIONS MANNED WATER STATIONS FOR DUS" CONTROL_________________________________ ____________ MAINTAIN TRAFFIC FLOW IN AND OUTQF AREA_______________________________________________ CONTINUE REMOVING DEBRIS FROM -OWER LEVELS OF TOWER 2_________________ ____________ DELAYS: 1 HR (12:00-1:00) WHILE CREW WENT UNDERGROUND TO INVESTIGATE AREA, 3 HOURS WITH GATEWAY 550 & GRA(3E 750 AT N/E CORNER OF TOWER 2 CORE WHILEj SEARCH AND RECOVERY FOR FIREFIGHTERS WAS CONDUCTED ! I GRACE CONTRACTING CORP Approved By: I Title: BY: For: SUPERINTENDENT

CITY_21MC100_003582270

NYC-WTC_000388186

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000388186Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →