Daily work force report, World Trade, Dec 11, 2001 (Night)

Machine-extracted title · confidence 38%

Night shift daily workforce and equipment listing for World Trade site, Dec 11, 2001.

NYC-WTC_000386651
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

I GRACE CONTRACTING CORP. 151-15 6lh Road, Whitestone. N.Y. 11357-(718)767-9000 DATE: DECEMBER 11. 2001 (NIGHT FINAL) 8PM DAILY WORK FORCE REPORT

Job Name & Location: World Trade Center Contract No. Weather Conditions dUEAR & MILD

Labor Equipment CLASSIFICATION QUANT. Description MAiNNED STANDBY IDLE SUPERINTENDENT 2 CAT 966 LOADER 1 PROJECT ENGINEER 1 CAT 446 BACKHOE 1 OFFICE ENGINEER CAT 973 LOADER 1 FOREMEN 2 CAT 365 GRAPPLER 1 SAFETY OFFICER CAT 375 GRAPPLER 1 LABORERS_________ 17 HITACHI 750 GRAPPLER 1 IRON WORKERS ,i HITACHI 550 GRAPPLER 1 LOCAL 14 5 HITACHI 550 GRAPPLER 1 LOCAL 15__________ 7 HITACHI 1200 GRAPPLER 1 CARPENTER j 185 CFM COMPRESSOR 1 CARPENTER FOREMAN 235 HAMMER HOE RAM 1 TEAMSTERS 1 MECHANICS TRUCK 1 1 MECHANICS 1 TOOLTRUCK 1 HOUSE WRECKERS i 12 TOOL VAN ROLL OFF DUMP TFtAILERS PROVIDED TRUCKING FOR ALL CONTRACTORS ON SITE LOW BED TRAILER TULLY HAD SOME FLATS AND EUKES HIGH DECK TRAILERS WELDING TRUCK ,1200/750/375 DOWN BELOW LOADING OUT DEBRIS FUEL TRUCK 1 AND STEEL - LOADED OUR TRAILERS AND TULLYS PICKUP TRUCKS 3 TRAILERS AND EUKES LIGHT TOWERS 13 SITE MULE 3 550 ON TOP LOADING OUR TRUCKS DUMP TRUCKS WORKED IN PIPE CHAMBER NORTH OF NORTH 10 WHEEL DUMP TRUCK ROJECTION PLACED MATS AND MILLINGS FLASHING ARROW BOARD 1 USED 446 OFFICE TRAILER/GENER. 1 CARGO BOXES 3 DELAYS: FLAT TRUCK 1 1-200 DOWN FRdlWn“;45"fo 1;15.- RECOVERY... . PUMP 9

375 DOWN FROM 10:00 TO 10:30 - RECOVERY ROLLER 1 RAINMAKER/GENIE LIFT 1

D escfiption of Work: ;___________________ WORK COMPLETED : LOAD OUT STEEL AND DEBRIS 35 GRACE AREA MAN TARPING AND TRIMMING STATIONS 34 EUKES MAN WATER STATIONS FOR DUST CONTROL 31 FLATS - DOWNSTAIRS MAINTAIN TRAFFIC FLOW IN AND OUT OF AREA ' 105 AMEC AREA 41===:======== CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF NW CORNER OF TOWER 2 INSTALLATION OF GPS SYSTEMS________________________ ELEVATIONS: ALL MACHINES LEVEL B-5 253

GRACE CONTRACTING CORP Approved By: Tille: " BY: ■^or; SUPERINTENDENT T

---- DAILY WORK FORCE REPORT 1211N.xlS

CITY_21MC100_003695196

NYC-WTC_000386651

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000386651Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000237597

A daily report from Grace Contracting Corp. detailing the workforce and equipment deployed at the World Trade Center site on December 11, 2001.

Similar indexed content

Compare copies and versions →