NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 3 pages

Work order: WTC water analyses scope

Machine-extracted title · confidence 50%

Project work order for World Trade Center water analyses and related tasks.

NYC-WTC_000386478–000386480
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document I • tJd.

Proposal Date: May 7,2002_________________ JCC CONSTRUCTION CORP. To: BOVlS/AMEC ALLIANCE 24-02 39TH AVENUE 200 VESSEY ST.- 30TH FLOOR LONG ISLAND CITY, NY 11101 City, State, Zip: NEW YORK, NY 10009 PHONE: (718)482-9600 Attention; .MR. LEONARD BARQNE-PROJ. M FAXc(718)482-16]6 Project name: WORLD TRADE CENTER RECOVERY We propose to furnish all material and perform all labor necessary to complete the following;

1. Remove end replace sand in playground areo.

2. Remove and replace sand in volleyball court area.

3. Remove top 6” of soil in bocce coun area,

4 Replace damaged railing along pier 25. Remove and replace all wood top handrails, power wash entire roiling and replace

I da-magc curb as needed. 'i 5 Excavate and remove temporary asphalt roadway. E.xcavalc and remove all gravel under temporary roadway. Excavate and V and remove of soil beneath gravel to elevation equal to bottom of the adjacent paidng ctone (between N Moore St & School).

6. Remove debn’s, patch as needed bike path. Paint lines as required to match tire existing bike path.

I, * Elirrunaic all power washing.

alternates

r 1.) Adjust utiliTy frame and cover total 11 @$ 4,000.00 en.

2.) Water for dust control not included.

3.) Asphalt restoration or patching not included.

4.) Payment and Perfonnance bond is not included in the base bid price.

i, We propose to furnish material and labor, complete in accordance with above specifications, for the i sum of: Three Hundred Ninety Seven Thousand two Hundred DoUars «fc No Cents (S397,200.00)

Payments to be made as follows;

Conaactor’s signature: David Cannizzaro/President

Acceptance of propo,sal - The above price, specifications and conditions are satisfactory and are hereby accepted. You are authoriaed to do the work as specified. Payment will be made as outlined above.

Owner's signarure: Date;

CITY_21MC100_006525249

NYC-WTC_000386478

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000386478Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000290803

Proposal to remove/replace sand and soil, railing, and other improvements at World Trade Center Recovery project.

Similar indexed content

NYC-WTC_000251944

Proposal outlining scope of work for WTC Recovery project tasks (playground, sand, railing, etc.).

Similar indexed content

Compare copies and versions →