Tribeca Tower air quality memo, Oct 2001

Machine-extracted title · confidence 41%

Update memo on air testing plans and results for Tribeca Tower residents.

NYC-WTC_000363389–000363391
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Our vendors have begun the exterior rigging of the scaffolds and will begin cleaning the fagade and windows of the building this week.

All common area HVAC filters have been changed with a high efficiency, pleated filters which are more effective in removing smaller particles from the air. The standard filters used prior to this change were rated to collect approximately 15% of particulate as small as 3 microns. The filters we have installed are rated to remove 40% of 3 micron particulate. In addition, our contractor has put us on a rotation for filter changes every three weeks, instead of the standard 6 week changeover to further improve filtering efficiency.

Our HVAC contractor also visited the building last week to try several alternative incremental unit filters on the sleeves of the HVAC units in our apartments. Unfortunately, he was so far unable to find one which successfully fit the unit’s sleeve. We are, however, investigating with a filter manufacturer the possibility of having custom made filters manufactured in volume just for our buildings. We will work diligently to ensure that if this is possible, it is performed timely. We have not found any information to indicate that HEPA filters can be added to the wall incremental units, though we continue to look for alternatives.

We are still anticipating a letter to be forthcoming from NYC DEP Commissioner Miele’s office regarding air quality in the area. As soon as we receive it, we will forward it on to you.

Our consultants have indicated that we can all do our part by using the revolving doors whenever possible at the building entrance.

We are, this week, speaking to vendors who have the ability to clean out air duct systems and will advise you as we schedule the work.

EMERGENCY SYSTEMS:

We have met with our existing intercom contractor (Casey Systems) to investigate upgrading our intercom system to a full PA system that would work throughout the building. Unfortunately, the system cannot be upgraded in its’ current form, so we are pursuing other avenues with various other vendors and manufacturers of this type of equipment.

In the next few days, we will have data entry sheets available at the concierge for you to provide us updated emergency contact information.

All emergency lights in the stairwells have been replaced and are confirmed operational. We are still investigating our options to further upgrade our emergency light system.

LEASING ISSUES:

2

CITY_21MC100_002847923

NYC-WTC_000363390

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000363390Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000318581

Tribeca Tower update to residents regarding building concerns and services following WTC event.

Similar indexed content

NYC-WTC_000337571

Resident meeting notice and response regarding building services.

Similar indexed content

Compare copies and versions →