q- Dishwashers toe plates will be removed and the floor beneath the appliance will be
cleaned.
r. Protective covers on finned radiant heaters and baseboard heaters will be removed to
expose heat elements. Fins are to be brushed and vacuumed to remove dust.
s. All cleaning equipment will be vacuumed and/or wet wiped for use on the residence.
1. HEP A air filtration devices (AFDs) will run continuously during all cleaning activities as
appropriate given site conditions. A minimum of one air change evei y 30-minutes shall be
provided. A standard 1200 efin device shall be installed per 36,000 cub c feet.
8. An adequate number of asbestos supervisors shall be present at each wo (work place
is defined in Title J5, Chapter 1 RCNY as the work area and the decorii bLeneJosure
system).
iilsiifc
llillii
9. A cleaning checklist (to be developed) will be comp! supervisor at the completion
of the cleaning.
10. A thorough visual inspection will be conduct le Project Me to verify the absence
of visible dust accumulations. Additional c procedures be performed where
visible dust is observed.
•SI
SSI*'
11. Air sampling shall be performed by the Air Sampling Technician after the area is free of dust
accumulations as determined by the Project Monitor. If the apartment does not meet the 30
year 10-04 risk based clean up criteria the apartment will be recleaned and retested.
12. Any damage or loss | that occurs caning is the responsibility of the cleaning
contractor. The clcanii contractor i dnsible for damage or loss caused by the acts
of parties not involved the cleanup.
.
13. All waste shall' eated as asbestos containing material. Transportation and
disposal be in compliance with all applicable rules and regulations.