NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 8 pages

Indoor dust cleaning program scope (Draft 7/30/02)

Machine-extracted title · confidence 39%

Scope of work for indoor dust cleaning and direct assistance program.

NYC-WTC_000362940–000362947
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Scope of Work B

Application: A visual inspection was performed and large or significant accumulations of dust or debris from the collapse of the WTC was observed in common areas, residences or portions thereof (such as windows, terraces or balconies).

Residents will not be allowed in the work area. Residents may be present in the residence during cleaning in cases where the work area can be isolated by the erection of isolation barriers. In all other applications of Scope B it is assumed that residents will not be present in the [ence. ■I 1. A site specific work plan will be prepared by the cleaning contraci approval by EPA prior to the start of work. This work planKll inclu^ netailSj sdures for the removal of dust and debris and the cleaning. At a minimum the procedi lecified for a Scope A cleaning shall be implemented.

2. An asbestos project notification form (NYC form submitted, as required by Title 15, Chapter 1 of the Rules of the City of Ne\ work (^ hfaectlv to the NYC DEP Asbestos Control Program prior to the st art ork. NYS notification shall also be submitted. ■(Ik

.all**'*' 'W 3. At least one asbestos supervisor shat >e present at ■k place (work place is defined in Title 15, Chapter 1 RCNY as the work area|flB the de© onination enclosure system).

4. Personal protective equipment including disposable clothing, gloves, and respirators shall be worn during this cleaning activity.

5. Warning signs shall be posted at the 0 the work area.

6. A worker lination cncloi system shall be installed at the entrance to the work area. A remote ination enclos systisrn shall be considered when appropriate, i.e. inability to compl e provision d to space limitation or other agency rules, such as for compliance wi City Fire Department egress requirements.

7. HVAC systems shall be shut down and locked out or isolated locally. The site specific work plan shall provide additional information on the HVAC system and proposed procedures for shutdown or isolation.

8. Isoh ;ion barriers shall be installed with two layers of 6-mil polyethylene sheeting and sealed with ■iiilii 9. Negative pressure ventilation equipment shall be installed and operated during all cleaning activities. Equipment shall run continuously until clearance air monitoring. A minimum of one air change every 30 minutes shall be provided. When ducting to the outside is not possible, a

7

CITY_21MC1OO_OO2847582

NYC-WTC_000362946

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000362946Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000140481 · Box DEP Box 05

Draft contract scope defining compliance requirements and assistance programs for cleaning World Trade Center dust in residences.

Similar indexed content

Compare copies and versions →