Scope of Work B
Application: A visual inspection was performed and large or significant accumulations of dust or
debris from the collapse of the WTC was observed in common areas, residences or portions thereof
(such as windows, terraces or balconies).
Residents will not be allowed in the work area. Residents may be present in the residence during
cleaning in cases where the work area can be isolated by the erection of isolation barriers. In all other
applications of Scope B it is assumed that residents will not be present in the [ence.
■I
1. A site specific work plan will be prepared by the cleaning contraci approval
by EPA prior to the start of work. This work planKll inclu^ netailSj sdures for the
removal of dust and debris and the cleaning. At a minimum the procedi lecified for a
Scope A cleaning shall be implemented.
2. An asbestos project notification form (NYC form submitted, as required by
Title 15, Chapter 1 of the Rules of the City of Ne\ work (^ hfaectlv to the NYC DEP
Asbestos Control Program prior to the st art ork. NYS notification shall also be
submitted. ■(Ik
.all**'*' 'W
3. At least one asbestos supervisor shat >e present at ■k place (work place is defined in
Title 15, Chapter 1 RCNY as the work area|flB the de© onination enclosure system).
4. Personal protective equipment including disposable clothing, gloves, and respirators shall be
worn during this cleaning activity.
5. Warning signs shall be posted at the 0 the work area.
6. A worker lination cncloi system shall be installed at the entrance to the work area.
A remote ination enclos systisrn shall be considered when appropriate, i.e. inability
to compl e provision d to space limitation or other agency rules, such as for
compliance wi City Fire Department egress requirements.
7. HVAC systems shall be shut down and locked out or isolated locally. The site specific work
plan shall provide additional information on the HVAC system and proposed procedures for
shutdown or isolation.
8. Isoh ;ion barriers shall be installed with two layers of 6-mil polyethylene sheeting and sealed
with
■iiilii
9. Negative pressure ventilation equipment shall be installed and operated during all cleaning
activities. Equipment shall run continuously until clearance air monitoring. A minimum of one
air change every 30 minutes shall be provided. When ducting to the outside is not possible, a
7