NYC 9/11 Public Portal Document
second negative pressure ventilation unit compatible with the primary unit may be connected
in series.
10. All WTC debris shall be misted and double-bagged. Accumulation of water is prohibited.
Water misting shall be sufficient to wet the material without water accumulations.
11. After the removal of debris, all surfaces Avill be cleaned in accordance with the procedures
specified in Scope A. After all surfaces have been cleaned, a second cleaning shall be
performed. This results in two full cleanings of all sui ^ces, wi [owing exception.
Carpets and fabric covered furniture cleaned with hot wat sr extract Kshall be cleaned
..Mil
only once. Surfaces include but are not limited | alls, floc gs, ledges, fringe,
appliances, equipment and furnishings.
1, J
12. EPA, in consultation with the owner, may identify ee lishings (e.g. and fabric
covered furniture) for disposal rather than cleaning. ’ .■
if residents’ personal property
1
shall not occur without prior written authorization I he owner. Disposal of all
wastes generated during the cleaning shall be the re' ;ponsin 3 contractor. All waste
generated shall be treated as asbestos-containi: rial (A< isportation and disposal
of generated waste shall be in compliance wi ippiicable ru' !d regulations.
«»■
13. A Cleaning Checklist (to be developed by EPA) will be wmplcted by the cleaning contractor
as tasks are completed to document the jirogress of the cleaning.
14. The cleaning contractor shall; hfy the litoring (tractor immediately upon completion
of the cleaning. The Monitor Com will ict a thorough visual inspection to verify
the absence of visible dust Kcumulal it is observed the cleaning contractor will
reclean as nccessa-y at no a bitional
15. Air sampling shall be perfoi I by the Air Sampling Technician after the area is free of dust
accumulations as dctennid / the Monitoring Contractor..
16. After successful ir monitoring, isolation barriers shall be removed in conjunction
withtheuseofaHEPAA-acuum.
17. Any damage or loss that occurs during clesning is the responsibility of the cleaning contractor.
The cleaning contractor is not responsible for damage or loss caused by the acts ofthird parties
not involved in the cleaning.
■III!
■■I!
18. All work shall be in compliance with all other applicable requirements of Title 15, Chapter 1
of the RCNY and New York Industrial Code Rule 56.
19. If mold, suspected ACM or peeling, flaking or chalking paint is observed, the cleaning
contractor shall immediately contact the Monitoring Contractor.
8
CITY_21MC100_002847583
NYC-WTC_000362947
OCR can misread numbers and units. Confirm readings against the page image before using them.