Draft scope of work for WTC residential dust cleaning, August

Machine-extracted title · confidence 100%

Draft document outlining procedures for asbestos removal and HEPA vacuuming in residential buildings south of Canal Street following the World Trade Center collapse.

NYC-WTC_000154317–000154326

Folder label: “WORLD TRADE CENTER - RESIDENTIAL APARTMENTS

Page image
Scanned page image, NYC-WTC_000154324
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

I

Scope of Work B

Application: A visual inspection was performed and large or significant accumulations of dust or debris from the collapse of the WTC was observed in common areas, residences or nA^ns thereof (such as windows, terraces or balconies). a

Residents will not be allowed in the work area. Residents may be preseij^Hme residenc^^H cleaning in cases where the work area can be isolated by the erectioi^Hrsolation bao^RV all other applications of Scope B it is assumed that residents will not l^nresent in t^^siden

17. A site specific work plan will be prepared by the cleaning contrrB w and approval by EPA prior to the start of work. This work plan will include* icedures for the removal of dust and debris and the cleaning. At a minimum the hcecified for a Scope A cleaning shall be implemented.

18. An asbestos project notification form (NYC form ACP-7) shaUbe submittei Ky Title 15, Chapter 1 of the Rules of the City of New Y ), directly DEP Asbestos Control Program prior to the start^fl BPL notifi ^all also be submitted.

19. At least one asbestos supervisor shall be pre^BTat each K pla^ ■c is defined in Title 15, Chapter 1 RCNY as the work area«d the de^^ ^minatioi ire system).

20. Personal protective equipment inclu' isposablQ^nthing, glo^Bfand respirators shall be worn during this cleaning activity. J

21. Warnin ms shall be po^ 'approach

22. Avt^^H mination^^H istem shall bemstal led at the entrance to the work area. A remo^H ^mation ei^H fcji shall be considered when appropriate, i.e. inability to comply ^^kcovision a ^^^^mitation or other agency rules, such as for compliance City ^^^^^nt egress requirements.

23. HVA< snrIM n and locked out or isolated locally. The site specific work plan^Oral provide addj fc^tion on the HVAC system and proposed procedures for [own or isolation.

24. solation barriers shall mstalled with two layers of 6-mil polyethylene sheeting and sealed /ith tape.

2| ;ative pressura^ntilation equipment shall be installed and operated during all cleaning b^e^E£|d^BKt shall run continuously until clearance air monitoring. A minimum of one

7

NYC-WTC_000154324

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000154324Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →