Draft scope of work for WTC residential dust cleaning, August

Machine-extracted title · confidence 90%

Draft document outlining procedures for asbestos removal and HEPA vacuuming in residential buildings south of Canal Street following the World Trade Center collapse.

NYC-WTC_000154327–000154335

Folder label: “WORLD TRADE CENTER - RESIDENTIAL APARTMENTS

Page image
Scanned page image, NYC-WTC_000154333
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

I

Scope of Work B

Application: A visual inspection was performed and large or significant accumulations oOust or debris from the collapse of the WTC was observed in common areas, residences or portio^Bj^reof (such as windows, terraces or balconies).

Residents will not be allowed in the work area. Residents may be prest ^Rne resides cleaning in cases where the work area can be isolated by the erection of i^ [on barriers. applications of Scope B it is assumed that residents will not be present le resideno^/

17. A site specific work plan will be prepared by the cleaning contS ew and approval by EPA prior to the start of work. This work plan will include jocedures for the removal of dust and debris and the cleaning. At a minimum the fcceci fled for a Scope A cleaning shall be implemented. A

18. An asbestos project notification form (NYC form ACP-7) le submittel^H Title 15, Chapter 1 of the Rules of the City of New Yod^ ^directly toW CP Asbestos Control Program prior to the start of v^^^^ ^fc^ification ilso be submitted.

19. At least one asbestos supervisor shall be prjMt at each ^k placl ^Ke is defined in Title 15, Chapter 1 RCNY as the worka^and the dj^ taminati f^ure system).

20. Personal protective equipment incl isposaWOlothing, glo^^, and respirators shall be worn during this cleaning activity

21. Wami I^ns shall be pj approach! ea.

22. A^^^H lination^^^^H item shall be installed at the entrance to the work area. A rcin^^H Imation fc|shall be considered when appropriate, i.e. inability to compl^ ^■uvision cH ^^^^mitation or other agency rules, such as for compliance City K ^^^nent egress requirements.

23. HVA^Iystems shanB and locked out or isolated locally. The site specific work nJ^^all provide adm (ration on the HVAC system and proposed procedures for Omtdown or isolation.

24, Isolation barriers shal installed with two layers of 6-mil polyethylene sheeting and sealed with tape. J

utive p^ entilation equipment shall be installed and operated during all cleaning

7

1 NYC-WTC_000154333

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000154333Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →