Scope of Work B
Application: A visual inspection was performed and large or significant accumulations of dust or debris
from the collapse of the WTC was observed in common areas, residences or portions thereof (such as
windows, terraces or balconies).
Residents will not be allowed in the work area. Residents may be present in the rg^ence during
cleaning in cases where the work area can be isolated by the erection of isolation bi B^s. In all other
applications of Scope B it is assumed that residents will not be ||esent in theresi ice.
1. A site specific work plan will be prepared by the cleaning contractor for f Bi^and appro^I
by EPA prior to the start of work. This work plan will include detailed ocedures for the
‘IS J
removal of dust and debris and the cleaning. At a minimum the procedi s specmed for a
Scope A cleaning shall be implemented.
2. An asbestos project notification form (NYC form ACP-7) shi Il submitted, as required by
Title 15, Chapter 1 of the Rules of the City of New York (RC 0, directly to the NYC DEP
Asbestos Control Program prior to the start ofiWork. NYs OL notification shall also be
subnritted.
3. At least one asbestos supervisor s ateac iice (work place is defined in
Title 75, Chapter 1 RCNY as the vOrk area the^ ation enclosure system).
4. Personal protective equipm^i^^ tuding disposable ciothing, gloves, and respirators shall be
worn during this cleaning -r
5. Wi shall be poste attheaWii <6 the work area.
6. A worker deco ntaminatione system shall be installed at the entrance to the work area.
A remote deco- BOhnation 1 System shall be considered when appropriate, i.e. inability
to comph^ii ^^vision dl to space limitation or other agency rules, such as for
compliance wii York City Fire Department egress requirements.
7.
' II
J^AC systems shaj i^||Kut down and locked out or isolated locally. The site specific work
^lan shall provide additional information on the HVAC system and proposed procedures for
shutdown or isolBBn.
8 Isolaitionhar shall be installed with two layers of 6-mil polyethylene sheeting and sealed
with
9. Negative pressure ventilation equipment shall be installed and operated during all cleaning
activities. Equipment shall run continuously until clearance air monitoring. A minimum of one
air change every 30 minutes shall be provided. When ducting to the outside is not possible, a
7
NYC-WTC_000139850