OSHA crane inspection initiative notes, WTC site

Machine-extracted title · confidence 39%

Joint crane inspection activity involving OSHA at World Trade Center locations and involved parties.

NYC-WTC_000361721–000361722
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Fax: Oct 17 2001 22:15 P. 04 J O.^lTzOi 17.'42 FAX 212 337 2371 VSJ>OL OSHa 21002

U.S. Department of Labor OcsupaSonal Safety and Health Administration 201 Varick Street Rsom 670 New York, New York 10014 Tel: 1212) 337-2378 F«x:(2( 2)337.2371 OSHA Website Address: http /Avww.osha.go.> 1 i 1 I I WTC Recovery Project Joint Crane Inspection Initlafive I I Report & Analysis 10/17/2001 I The joint crane inspection initiative was launched on Friday 10/12/01. The team consisted of three OSHA compliance officers with extensive crane inspection experience. The team was accompanied by similarly experienced persoanei from BechteL At various points, the team was joined by reprisseotstives of ^e Operating Engineers and the employers affected. The team is still following up on erases which were not available for inspectian during the period. The team is also focus do rigging issues, slings, man baskets, and related topics of concern. From 10Z12-iL seventeen cranes were .inspccted at the site. Of these, ten were found to have serious safety! deficiencies. The breakdown by sector follows (note: the sector identifies the prime contractoT, but the crane may be owned, rented, or used by a subcontractor):

i

Sector Cranes inspected Cranes with deficiencies Amoc 5 3 Bovis 4 2 TuUy 4 3

Turner 4 2 TOTAL 17 10

A total of 38 serious hazards were identified on fixe ten cranes with deficiencies. Most of the hazards related to crane setup, rigging, and hoisting practices. The most serious concerns relate to the practice of persotmsl hoisting using manbaskets. Other concerns raised deal with the general lack of preventative maintenance and down-time for the crane. The constant pace ofthe job also raises safety concerns due to fhcigue of operators and grounds-persons. Continuing attention also needs to be paid to the adequacy of the foundations for the cranes, not only when set up but also when traveling. Finally, there needs -o be a system in place to communicate between shifts if equipment is taken out of service. It has been observed that defective slings are discarded on the ground but not marked, meaning they might get used by another crew. A similar situation could arise with the cranes themselves. Some consistent form of tagging or marking should he developed.

CITY_21MC100_006537283

NYC-WTC_000361721

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000361721Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.