NYC-WTC_000362268
Overview of OSHA asbestos sampling results, including higher concentrations near rubble pile.
13 shared non-person entities · 1 shared topics · similarity 0.960
machine-extracted · confidence unavailable · Check page ↗Joint crane inspection activity involving OSHA at World Trade Center locations and involved parties.
NYC-WTC_000361721–000361722OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
Fax: Oct 17 2001 22:15 P. 04 J O.^lTzOi 17.'42 FAX 212 337 2371 VSJ>OL OSHa 21002
U.S. Department of Labor OcsupaSonal Safety and Health Administration 201 Varick Street Rsom 670 New York, New York 10014 Tel: 1212) 337-2378 F«x:(2( 2)337.2371 OSHA Website Address: http /Avww.osha.go.> 1 i 1 I I WTC Recovery Project Joint Crane Inspection Initlafive I I Report & Analysis 10/17/2001 I The joint crane inspection initiative was launched on Friday 10/12/01. The team consisted of three OSHA compliance officers with extensive crane inspection experience. The team was accompanied by similarly experienced persoanei from BechteL At various points, the team was joined by reprisseotstives of ^e Operating Engineers and the employers affected. The team is still following up on erases which were not available for inspectian during the period. The team is also focus do rigging issues, slings, man baskets, and related topics of concern. From 10Z12-iL seventeen cranes were .inspccted at the site. Of these, ten were found to have serious safety! deficiencies. The breakdown by sector follows (note: the sector identifies the prime contractoT, but the crane may be owned, rented, or used by a subcontractor):
i
Sector Cranes inspected Cranes with deficiencies Amoc 5 3 Bovis 4 2 TuUy 4 3
Turner 4 2 TOTAL 17 10
A total of 38 serious hazards were identified on fixe ten cranes with deficiencies. Most of the hazards related to crane setup, rigging, and hoisting practices. The most serious concerns relate to the practice of persotmsl hoisting using manbaskets. Other concerns raised deal with the general lack of preventative maintenance and down-time for the crane. The constant pace ofthe job also raises safety concerns due to fhcigue of operators and grounds-persons. Continuing attention also needs to be paid to the adequacy of the foundations for the cranes, not only when set up but also when traveling. Finally, there needs -o be a system in place to communicate between shifts if equipment is taken out of service. It has been observed that defective slings are discarded on the ground but not marked, meaning they might get used by another crew. A similar situation could arise with the cranes themselves. Some consistent form of tagging or marking should he developed.
CITY_21MC100_006537283
NYC-WTC_000361721
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000362268
Overview of OSHA asbestos sampling results, including higher concentrations near rubble pile.
13 shared non-person entities · 1 shared topics · similarity 0.960
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000154472
Memo summarizing daily activities including hot sidewalk conditions and a FEMA meeting request on October 17, 2001.
15 shared non-person entities · similarity 0.964
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000154467
Memo summarizing daily activities including hot sidewalk conditions and a FEMA meeting request on October 17, 2001.
13 shared non-person entities · similarity 0.962
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000290789
Summary of OSHA asbestos air sampling results across financial district and rubble pile areas.
15 shared non-person entities · 1 shared topics · similarity 0.959
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000322705
DDC memo on air quality monitoring results for WTC debris removal, Oct 17, 2001.
15 shared non-person entities · 1 shared topics · similarity 0.958
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000154484
Memo summarizing daily activities including an OEM request for storm water system assistance on October 19, 2001.
13 shared non-person entities · 1 shared topics · similarity 0.958
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000361047
DDC memorandum on site air quality monitoring, asbestos and other parameters.
15 shared non-person entities · 1 shared topics · similarity 0.957
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000251942
Bechtel/ATC air sampling results for asbestos and lead at World Trade Center site, Oct 2001.
14 shared non-person entities · 1 shared topics · similarity 0.956
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000417579
OSHA asbestos sampling summary for financial district, Oct 2001.
15 shared non-person entities · 1 shared topics · similarity 0.956
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000418706
OSHA air monitoring summary: asbestos results across financial district and rubble pile areas.
15 shared non-person entities · 1 shared topics · similarity 0.956
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388821
Asbestos, lead, heavy metals results by zone; summary of exceedances per PEL.
14 shared non-person entities · 1 shared topics · similarity 0.956
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000418693
Financial district sampling; rubble pile exceedances; no detectable asbestos at Pier 25 debris unloading area.
15 shared non-person entities · 1 shared topics · similarity 0.956
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000149936
Joint OSHA and Bechtel crane inspection report analyzing safety conditions at the World Trade Center site.
Similarity score 0.995 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000154472
Memo summarizing daily activities including hot sidewalk conditions and a FEMA meeting request on October 17, 2001.
Similarity score 0.993 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000154467
Memo summarizing daily activities including hot sidewalk conditions and a FEMA meeting request on October 17, 2001.
Similarity score 0.985 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000154472
Memo summarizing daily activities including hot sidewalk conditions and a FEMA meeting request on October 17, 2001.
Similarity score 0.943 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000154467
Memo summarizing daily activities including hot sidewalk conditions and a FEMA meeting request on October 17, 2001.
Similarity score 0.938 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000290832
OSHA/AMEC hazard summary for WTC site, 9/21/2001–10/7/2001.
Similarity score 0.935 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Machine-extracted building matches; verify each source. Buildings, never households.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
Memo summarizing daily activities including hot sidewalk conditions and a FEMA meeting request on October 17, 2001.
Similar indexed content
Memo summarizing daily activities including hot sidewalk conditions and a FEMA meeting request on October 17, 2001.
Similar indexed content
NYC-WTC_000362268
Overview of OSHA asbestos sampling results, including higher concentrations near rubble pile.
Similar indexed content
NYC-WTC_000290789
Summary of OSHA asbestos air sampling results across financial district and rubble pile areas.
Similar indexed content
NYC-WTC_000322705
DDC memo on air quality monitoring results for WTC debris removal, Oct 17, 2001.
Similar indexed content