I WTC Recovery Project
.Toint Crqpe lagpection Initiative
I Report & Analysis 10/17/2001
I
The joint crane inspection initiative was launched on Friday 10/12/01, The team consisted of
three OSHA compliance officers with extensive crane inspection experience. The team was
accompanied by similarly experienced personnel from BechteL At various points, the team was
joined by representatives of the Operating Sngineers and the employers affected. The team is
still following up on cranes which were not available for inspection during the period. The team
is also focus do rigging issues, slings, man bwkets, and related topics of concern.
From 10/12-1,4, seventeen cranes were .inspccted at the site. Of these, ten were found to have
serious safety! deficiencies. The breakdown by sector follows (note; the sector identifies the
prime contractor, but the crane may be owned, rented, or used by a subcontractor):
.Sector Cranes inspected Cranes with
Mir- ,
deficiencies
Amec 5 3
Bovis, 4 2
TuUy 4 3
Turner 4 2
TOTAL ' 17. 10
A total of 38 serious hazards were identified on the ten cranes with deficiencies. Most of the*
hazards related to crane setup, rigging, and hoisting practices. The most serious concerns relate ■
.to ±e practice of personnel hoisnng using manbaskets. Other concerns raised deal with the
1 general lack of preventative maintenance and down-time for the crane. The constant pace of the
job also raises safety concerns due to fhtigue of operators and grouads-persons. Continuing
attention also needs to be paid to the adequacy of the foundations for the cranes, not only when
set up but also when traveling. Finally, there needs to be a system in place to communicate
between shifts if equipment is taken out of service. It has been observed that defective slings are
discarded on the ground but not marked, meaning they might get used by another crew, A
similar situation could arise with the cranes themselves. Some consistent fbnn of tagging or
- -T. marking should be developed. .