NYC-WTC_000305493
Daily workforce and equipment listing for World Trade Center site; weather noted.
1 shared non-person entities · 1 shared topics · similarity 0.980
machine-extracted · confidence unavailable · Check page ↗Day final daily workforce and equipment at World Trade site, Feb 27 2002.
NYC-WTC_000361519OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
GRACE CONTRACTING CORP. i5i.«5SmRoa(l. Wnltestono, N.Y. 111S7-(718)7S7-3OW) DATE; 271/02 DAY FINAL csnc DAILY WORK FORCE REPORT
Job Name & Location; World Trade Center Contract No. Weather Conditions: COOL AND RAINY
Labor Ifr Equipment CLASSIFICATION QUANT. _______ Deacription______ SUPERINTENDENT 1 CAT 866 LOADER PROJECT ENGINEER 2 CAT 365 GRAPPLER 1 OFFICE ENGINEER CAT 375 GRAPPLER 2 FOREMEN 1- HITACHI Z50 GRAPPLER 1 SAFETY OFFICER 1 HITACHI 1200 GRAPPLER 1 LABORERS 9 185 CFM COMPRESSOR 1 IRON WORKERS 235 HAMMER HOE RAM 1 LOCAL 14 5 MECHANICS TRUCK 2 LOCAL 15 5 TOOL TRUCK 1 CARPENTER 1 TOOL VAN CARPENTER FOREMAN 1 ROLL OFF TEAMSTERS (FUEL. TRAILER DELIVERY) 1 DUMP TRAILERS s TEAMSTERS (FLATBEDS. DUMPS, AND EUKES) 14 LOW BED TRAILER MECHANICS 2 HIGH DECK TRAILERS 3 HOUSE wreckers WELDING TRUCK 1 FUEL TRUCK 1 PICKUP TRUCKS 8 LIGHT TOWERS 5 DELIVERIES; SITE MULE 3 DUMP TRUCKS 10 WHEEL DUMP TRUCK •NOTE: TRUCK 73 RAN FOR KOCH FROM 7:00 PM TO 10:00 PM FLASHING ARROW BOARD 1 AND FROM 2:00 PM TO 6:00 PM OFFICE TRAILER/GENER. 1 CARGO BOXES 4 DELAYS: TRUCK 62 (GPS) & TRUCK 64 TWICE WITH GPS FLAT TRUCK 1 _______ PROBLEMS. TOTAL TIME LOST WAS ABOUT 4 HRS. PUMP 2 TRUCKS GENERALLY RUNNING SLOW
LIGHT TOWERS USED FOR 2.5 HOURS
Description of Work: ______________________________________________ __ ______________ COMPLerEDWORK______________________________________________ __ continue removing DEBRIS FROM LOWER LEVELS OF V/TC COMPLEX. MACHINESAT EL. B6 MAINTAIN TRAFFIC FLOW INTO AND OUT OF AREA ~ RECORD TIMES AND NUMBERS OF TRUCK LOADS OF DEBRIS FROM SITE LOADS OUT: 83 YUKES: 138 DOT LOADS: 128 01.607387 GRACE CONTRACTING CORP Approved By; BY: Tlila:______ For: SUPERINTENDENT
DAILY WORK FORCE REPORT020lD.xla
CITY_21MC100_002846053
NYC-WTC_000361519
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000305493
Daily workforce and equipment listing for World Trade Center site; weather noted.
1 shared non-person entities · 1 shared topics · similarity 0.980
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305085
Day shift crew and equipment at World Trade; Feb 27, 2002.
1 shared non-person entities · 1 shared topics · similarity 0.979
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000278845
Daily workforce and equipment log for WTC site operations.
1 shared non-person entities · 1 shared topics · similarity 0.971
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000322605
Day final workforce and equipment listing for World Trade site, Feb 1, 2002.
1 shared non-person entities · 1 shared topics · similarity 0.970
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000419169
Final daily workforce roster for 2/27/02 at World Trade project.
1 shared non-person entities · 1 shared topics · similarity 0.970
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305091
Night shift workforce and equipment at World Trade; Feb 3, 2002.
1 shared non-person entities · 1 shared topics · similarity 0.967
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000432595
Night shift workforce and equipment at World Trade Center, Feb 2002.
1 shared non-person entities · 1 shared topics · similarity 0.967
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000389559
Day final daily workforce and equipment list for World Trade site, Feb 2002.
1 shared non-person entities · 1 shared topics · similarity 0.967
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305500
Night final daily workforce and equipment listing for World Trade Center site.
1 shared non-person entities · 1 shared topics · similarity 0.966
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388152
Daily workforce and equipment deployment report for World Trade Center project.
1 shared non-person entities · 1 shared topics · similarity 0.966
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000432589
Day shift daily workforce and equipment list for World Trade Center, Feb 2002.
1 shared non-person entities · 1 shared topics · similarity 0.966
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305494
Night final daily workforce and equipment list for World Trade Center site.
1 shared non-person entities · 1 shared topics · similarity 0.966
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000305493
Daily workforce and equipment listing for World Trade Center site; weather noted.
Similarity score 0.990 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305085
Day shift crew and equipment at World Trade; Feb 27, 2002.
Similarity score 0.989 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000278845
Daily workforce and equipment log for WTC site operations.
Similarity score 0.986 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000322605
Day final workforce and equipment listing for World Trade site, Feb 1, 2002.
Similarity score 0.985 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000419169
Final daily workforce roster for 2/27/02 at World Trade project.
Similarity score 0.985 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305091
Night shift workforce and equipment at World Trade; Feb 3, 2002.
Similarity score 0.984 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000305493
Daily workforce and equipment listing for World Trade Center site; weather noted.
Similar indexed content
NYC-WTC_000305085
Day shift crew and equipment at World Trade; Feb 27, 2002.
Similar indexed content
NYC-WTC_000278845
Daily workforce and equipment log for WTC site operations.
Similar indexed content
NYC-WTC_000322605
Day final workforce and equipment listing for World Trade site, Feb 1, 2002.
Similar indexed content
NYC-WTC_000419169
Final daily workforce roster for 2/27/02 at World Trade project.
Similar indexed content