NYC-WTC_000305085
Day shift crew and equipment at World Trade; Feb 27, 2002.
1 shared non-person entities · 1 shared topics · similarity 0.974
machine-extracted · confidence unavailable · Check page ↗Daily workforce and equipment deployment report for World Trade Center project.
NYC-WTC_000388152OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
GRACE CONTRACTING CORP. iSi.*S6inRoad, wnneswno. N.Y. 11357-(718)7SZ-9OOO DATE: 2/1/02 DAY FINAL
DAILY WORK FORCE REPORT
Job Nam® 4 Location: World Trade Center Contract No. Weather Conditions: COOLAND RAINY saac up ■ . BagM—mo Labor IEquipment CLASSIFICATION QUANT. Description MANNED STANDBY IDLE SUPERINTENDENT 1 ■ CAT 868 LOADER 1 PROJECT ENGINEER 2 ■ CAT 365 GRAPPLER 1 OFFICE ENGINEER ' CAT 375 GRAPPLER 2 FOREMEN 1 ■ HITACHI 750 GRAPPLER 1 SAFETY OFFICER 1 HITACHI 1200 GRAPPLER 1 LABORERS 9 185 CFM COMPRESSOR 1 IRON WORKERS 235 HAMMER HOE RAM 1 LOCAL 14 5 MECHANICS TRUCK 2 LOCAL 15 5 TOOL TRUCK 1 CARPENTER 1 TOOL VAN CARPENTER FOREMAN 1 ROLLOFF TEAMSTERS (FUEL. TRAILER DELIVERY) 1 DUMP TRAILERS 8 teamsters (FLATBEDS. DUMPS. AND EUKES) 14 ■ LOW BED TRAILER MECHANICS 2 ■ HIGH DECK TRAILERS 3 HOUSE wreckers ■ WELDING TRUCK 1 ■ FUEL TRUCK 1 ■ PICKUP TRUCKS 8 ■ LIGHT TOWERS 5 DELIVERIES: ■ SITE MULE 3 ■ DUMP TRUCKS ■ 10 WHEEL DUMP TRUCK ’NOTE: TRUCK 73 RAN FOR KOCH FROM 7:00 PM TO 10:00 PMi FLASHING ARROW BOARD 1 AND FROM 2:00 PM TO 6:00 PM OFFICE TRAILER/GENER. 1 CARGO BOXES 4 DELAYS: TRUCK 62 (GPS) & TRUCK 64 TWICE WITH GPS FLAT TRUCK 1 PROBLEMS. TOTAL TIME LOST WAS ABOUT 4 HRS. PUMP 2 TRUCKS GENERALLY RUNNING SLOW
[LIGHT TOWERS USED FQR Z-5 HOU^
3BS Description of Work:__________________________________________________________ _ COMPLETED WORK CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF WTC COMPLEX. MACHINES AT EL. B6 MAINTAIN traffic FLOW INTO AND OUT OF AREA RECORD TIMES ANO NUMBERS OF TRUCK LOADS OF DEBRIS FROM SITE LOADS OUT; YUKES; 138 DOT LOADS: 128
GRACE CONTRACTING CORP Approved By: BY: Tllte:______ For: ISUPERINTENDENT
DAILY WORK FORCE REPORTC201D.xls
CITY_21MC100_003700583
NYC-WTC_000388152
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000305085
Day shift crew and equipment at World Trade; Feb 27, 2002.
1 shared non-person entities · 1 shared topics · similarity 0.974
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305493
Daily workforce and equipment listing for World Trade Center site; weather noted.
1 shared non-person entities · 1 shared topics · similarity 0.972
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280821
Night final daily workforce and equipment at World Trade, Jan 12, 2002.
1 shared non-person entities · 1 shared topics · similarity 0.968
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305494
Night final daily workforce and equipment list for World Trade Center site.
1 shared non-person entities · 1 shared topics · similarity 0.967
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000432589
Day shift daily workforce and equipment list for World Trade Center, Feb 2002.
1 shared non-person entities · 1 shared topics · similarity 0.966
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000432595
Night shift workforce and equipment at World Trade Center, Feb 2002.
1 shared non-person entities · 1 shared topics · similarity 0.966
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000389559
Day final daily workforce and equipment list for World Trade site, Feb 2002.
1 shared non-person entities · 1 shared topics · similarity 0.966
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000361519
Day final daily workforce and equipment at World Trade site, Feb 27 2002.
1 shared non-person entities · 1 shared topics · similarity 0.966
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305064
Daily workforce and equipment assignments for World Trade Center job, Jan 2002.
1 shared non-person entities · 1 shared topics · similarity 0.965
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000419177
Preliminary daily workforce and equipment for 2/0/02 at World Trade.
1 shared non-person entities · 1 shared topics · similarity 0.965
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000419169
Final daily workforce roster for 2/27/02 at World Trade project.
1 shared non-person entities · 1 shared topics · similarity 0.964
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000356576
Day shift daily workforce and equipment roster for Grace Contracting at World Trade Center site, January 2002.
1 shared non-person entities · 1 shared topics · similarity 0.964
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000305085
Day shift crew and equipment at World Trade; Feb 27, 2002.
Similarity score 0.987 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305493
Daily workforce and equipment listing for World Trade Center site; weather noted.
Similarity score 0.986 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280821
Night final daily workforce and equipment at World Trade, Jan 12, 2002.
Similarity score 0.984 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305494
Night final daily workforce and equipment list for World Trade Center site.
Similarity score 0.984 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000432589
Day shift daily workforce and equipment list for World Trade Center, Feb 2002.
Similarity score 0.983 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000432595
Night shift workforce and equipment at World Trade Center, Feb 2002.
Similarity score 0.983 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000305085
Day shift crew and equipment at World Trade; Feb 27, 2002.
Similar indexed content
NYC-WTC_000305493
Daily workforce and equipment listing for World Trade Center site; weather noted.
Similar indexed content
NYC-WTC_000280821
Night final daily workforce and equipment at World Trade, Jan 12, 2002.
Similar indexed content
NYC-WTC_000305494
Night final daily workforce and equipment list for World Trade Center site.
Similar indexed content
NYC-WTC_000432589
Day shift daily workforce and equipment list for World Trade Center, Feb 2002.
Similar indexed content