NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 92 pages

NIST/CS compliance document for security systems

Machine-extracted title · confidence 25%

Sanitation dept. form referencing NIST guide and security standards for NYC systems.

NYC-WTC_000360278–000360369
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

servers, are usually considered to be critical. However, the analysis may determine that certain IT components, such as a printer or print server, are not needed to support critical services.

3.2.2 Identify^ Disruption Impacts and Allowable Outage Times In this step, the Contingency Planning Coordinator should analyze the critical resources identified in the previous step and determine the impact(s) on IT operations if a given resource were disrupted or damaged. The analysis should evaluate the impact of the outage in two ways. ■ The effects of the outage may be tracked over time. This will enable the Contingency Planning Coordinator to identify the maximum allowable time that a resource may be denied before it prevents or inhibits the performance of an essential function ■ The effects of the outage may be tracked across related resources and dependent systems, identifying any cascading effects that may occur as a disrupted system affects other processes that rely on it.

3.2.3 Develop Recovery Priorities The outage impact(s) and allowable outage times characterized in the previous step enable the Contingency Planning Coordinator to develop and prioritize recovery strategies that personnel will implement during contingency .plan activation.'^ For example, if the outage impacts step determines that the system must be recovered within four hours, the Contingency Planning Coordinator would need to adopt measures to meet that need. Similarly, if most system components could tolerate a 24-hour outage but a critical component could only be unavailable for eight hours, the Contingency Planning Coordinator would prioritize the necessary resources for the critical component. By prioritizing these recovery strategies, the Contingency Planning Coordinator may make more informed, tailored decisions regarding contingency resource allocations and expenditures, saving time, effort, and costs.

3.3 Identify Preventive Controls

As indicated in Section 3.2, the BIA can provide the Contingency Planning Coordinator with vital information regarding system availability and recovery requirements. In some cases, the outage impacts identified in the BIA may be mitigated or eliminated through preventive measures that deter, detect, and/or reduce impacts to the system. Where feasible and cost- effective, preventive methods should be used rather than measures designed to recover the system after a disruption. A wide variety of preventive controls are available, depending on system type and configuration; however, some common measures are listed below: ■ Appropriately sized uninterruptible power supplies (UPS) to provide short-term backup power to all system components (including environmental and safety controls) ■ Gasoline- or diesel-powered generators to provide long-term backup power ■ Air conditioning systems with adequate excess capacity to permit failure of certain components, such as a compressor

The recovery strategy may include a combination of preventive controls described in Section 3.3 and recovery techniques and technologies described in Section 3.4.

17

NYC-WTC_000360307

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000360307Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000279102

Building Department memo/guide related to emergency planning after 9/11.

Similar indexed content

NYC-WTC_000165900 · Box 7DDC

Document page containing contact details for Con Edison and JWC Environmental Health & Safety personnel.

Similar indexed content

Compare copies and versions →