NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 92 pages

NIST/CS compliance document for security systems

Machine-extracted title · confidence 25%

Sanitation dept. form referencing NIST guide and security standards for NYC systems.

NYC-WTC_000360278–000360369
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

3.2 Conduct Business Impact Analysis

The BIA is a key step in the contingency planning process. The BIA enables the Contingency Planning Coordinator to characterize fully the system requirements, processes, and interdependencies and use this information to determine contingency requirements and priorities. The sample BIA process outlined in this section, illustrated in Figure 3-2, helps Contingency Plaiming Coordinators streamline and focus their contingency plan development activities to achieve a more effective plan.-’ An example of the BIA process and a sample BIA template are provided in Appendix B.

Identify Critical IT Resources Identify Outage Impacts and Develop Recovery Allowable Outage Times Priorities input from usere, PROCESS: 2. Time and Attendance Reporting Resource Recovery business process Critical Business Process Critical Resources owners, application Max Allowable Priority owners, and other Critical Resource Outage Impact 1. Payroll Processing associated groups • LAN Server High • LAN Server • LAN Server 2. Time and Attendance 8 hours • Delay in time Reporting • WAN Access sheet processing • WAN Access Medium ' WAN Access 3. Time and Attendance • E-mail • Mainframe • Inability to • E-mail Low Verification Access perform routine • Mainframe High • Mainframe Access payroll Access 4. Time and Attendance • E-mail server • E-mail server operations Approval • E-mail server High * Delay in payroll processing X

Figure 3-2. Business Impact Analysis Process for the Hypothetical Government Agency

3.2.2 Identify Critical IT Resources IT systems can be very complex, with numerous components, interfaces, and processes. A system often has multiple missions resulting in different perspectives on the importance of system services or capabilities. This first BIA step evaluates the IT system to determine the critical functions performed by the system and to identify the specific system resources required to perform them. Two activities usually are needed to complete this step: ■ The Contingency Planning Coordinator should identify and coordinate with internal and external points of contact (POC) associated with the system to characterize the ways that they depend on or support the IT system. This coordination should enable the system manager to characterize the full range of support provided by the system, including security, managerial, technical, and operational requirements. ■ The Contingency Planning Coordinator should evaluate the system to link these critical services to system resources. This analysis usually will identify infrastructure requirements such as electric power, telecommunications connections, and environmental controls. Specific IT equipment, such as routers, application servers, and authentication

For completeness and to assist Contingency Planning Coordinators who may be new to or unfamiliar with the major application or general support system, the sample BIA process presented here includes basic steps. The BIA purpose is to correlate specific system components with the critical services that they provide, and based on that information, to characterize the consequences if system components were to be disrupted. In many cases, the Contingency Planning Coordinator will be very familiar with specific system components and the ways in which they support business processes. This is especially true with respect to small systems. In these cases, not all BIA steps may be necessary; the Contingency Planning Coordinator may modify the approach to fit the respective system and contingency planning needs.

16

NYC-WTC_000360306

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000360306Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000279102

Building Department memo/guide related to emergency planning after 9/11.

Similar indexed content

NYC-WTC_000165900 · Box 7DDC

Document page containing contact details for Con Edison and JWC Environmental Health & Safety personnel.

Similar indexed content

Compare copies and versions →