NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 1 page

Invoice list, BOE projects exteriors

Machine-extracted title · confidence 41%

Invoices itemizing exteriors cleaning, scaffolding, and related services for school building.

NYC-WTC_000359592
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

NEW YORK CITY BOARD OF EDUCATION 90/100 TRINITY PLACE INVOICES

as of May 28. 2002

i ________ FEMA Contractor Billing I.D. Amount Work Type Cade? Scope

Submitted to Date Corinthian 1150 $ 2,867.23 Exteriors A 100 secondary cleaning lower aud. roof National Environmental Safety 3704-2001-#1 198,691.00 Exteriors A 90 exterior cleaning National Environmental Safety 3706-2001-#1 204,800.00 Exteriors A 100 exterior cleaning National Environmental Safety 3705-2001-#2 51,200.00 Exteriors A 100 exterior cleaning National Environmental Safety 3704/5-2001-#! 28,175.00 Scaffolding A 90/100 sidewalk bridging National Environmental Safety 3704/5-2001-#2 10,225.00 Scaffolding A 90/100 sidewalk bridging National Environmental Safety 3704/5-2001-#1R $ 1,481.22 Scaffolding A 90/100 sidewalk bridging 18-day rental Stanco Electric 2041 $ 1,031,58 Scaffolding 90 bridge lighting Stanco Electric 2073 $ 632.45 Scaffolding 77 100 bridge lighting Stanco Electric 2074 $ 903.96 Scaffolding A 100 br. Itg, trouble-shoot breaker & remedy Stanco Electric 2089 $ 596.52 Scaffolding A 90 bridge lighting Stanco Electric 2099 $ 847.82 Scaffolding A 100 bridge lighting Stanco Electric 2128 $ 608.18 Scaffolding A 90 bridge lighting Stanco Electric 2137 $ 471.02 Scaffolding A 100 bridge lighting emergency response $ 502,530.98 ATC Associates, Inc. $ 182,768.60 Air Mon/Test AorE 90 air monitoring/analysis through 2/02 ATC Associates, Inc. 2 $ 87,215.20 Air Mon/Test AorE 100 air monitoring/analysis through 2/02 Taylor Environmental 129 S 30,928.00 Air Mon/Test AorE 90 air sampling Taylor Environmental_______ 132 $ 32,465.00 Air Mon/Test AorE 100 air sampling Taylor Environmental 139 $ 43,873,00 Air Mon/Test AorE 100 air sampling Warren & Panzer Engineering 138 S 3,950.00 Air Mon/Test AorE asbestos monitoring @ 90 Trinity AWL Industries, Inc. 16 $ 111,553.23 HVAC AorE 100 HVAC rehab AWL industries, Inc. 17 $ 95,929.86 HVAC AorE 90 HVAC rehab Burns and Roe 2, 3. 4, 5, 6 s 31,248.56 HVAC AorE 90 and 100 Trinity HVAC engineering Corinthian 1149 s 49,000.00 HVAC AorE 100 air shaft return cleaning/reinsulation KW Tech 03-1001/tf1$ 32,610 00 HVAC AorE 100 ductwork insulation replacement KW Tech 03.1001/#2 $ 5,07800 HVAC AorE 100 additional ductwork insulation Stance Electric 2049$ 717.16 HVAC AorE 100 troubleshoot exhaust fans 9th floor Stanco Electric 2060$ 1,116.40 HVAC A or E 100 troubleshoot fan shutdown relays V&R Mechanical $ 420,000.00 HVAC A or E 100 HVAC duct cleaning V&R Mechanical 8 (change order) $ 1,500.00 HVAC AorE 100 damaged ductwork at 6th floor V&R Mechanical 18 (change order) $ 966.00 HVAC AorE 100 fresh air intake grille coverings/filters V&R Mechanical 19 (change order) $ 5,049.00 HVAC AorE 100 clean mixing boxes after new dampers V&R Mechanical 20 (change order) $ 1,530.00 HVAC AorE 100 clean mixing boxes (plenums) 100 reclean floors 3,5,7,9,10, basement; inspect V&R Mechanical 56 (change order) $ 205,710.00 HVAC AorE HVAC entire building; etc. V&R Mechanical 11581 S 398,000.00 HVAC AorE 90 HVAC duct cleaning V&R Mechanical 1 (change orders) S 16,250.00 HVAC AorE 90 clean mech. foonVreplace metal (lex Kiss Construction 19 s 514,561.23 interiors AorE 90 interior cleaning Kiss Construction 29 s 1,084,323.82 Interiors AorE 100 interior cleaning Trio Asbestos 22 s 666,946.07 Interiors AorE 100 interior clean-up $ 4,023.294.13 Board of Education Custodian PO-1 s 104.320.08 Mise. A, B, & E 90/100 custodial labor/cleaning $ 104,320.08 DSF (work order for Simplex) 00101279-01 $ 25,647.90 MakeSafe B 100 repair fire alarm system DSF (work order) 00024866-03 $ 114 53 MakeSafe B 100 control valves hot water system DSF (work order) 00024866-04 s 509.63 MakeSafe B 100 chill water valve DSF (work order) 00052472-01 $ 1,719.21 MakeSafe B 100 public address system DSF (work order) 73613 $ 2,112.35 MakeSafe B 100 plumbing in 121ti floor bathroom DSF (work order) 00090363-01 S 7,000.00 MakeSafe B 90/100 plumbing repairs DSF (work order) 00092514-03 $ 3,291.58 MakeSafe B 9Q/1D0 glass in walkway__________________ DSF (work order) 00093067-01 $ 1,919.64 MakeSafe B 100 locks DSF (work order) 00093074-01 s 18,144,32 MakeSafe B 100 locks, doors, door checks DSF (work order) 00093195-01 $ 4,932.29 MakeSafe B 10D door glass / metal sash windows DSF (work order) 00093200-01 s 1,690.19 MakeSafe B 90 glass main entrance doors______________ DSF (work order) 00093200-03 $ 1,571.01 MakeSafe B 90 doors, wood floor in gymnasium DSF (work order) 00093200-04 $ 4,619.47 MakeSafe B 90 fire hatch at stainA/ay DSF (work order) 00093322-01 $ 518.83 MakeSafe B 90 interior glazing________________________ DSF (work order) 00Q93322-Q2 $ 1,432.21 MakeSafe B 90 door checks replacement. DSF (work order) 00093322-03 $ 12.24 MakeSafe B 90 repair locks L. Naro 0017J-00 $ 18,187.41 MakeSafe B 90 glass in lobby Albert Kung 1 $ 9,616.00 Panels B 90 panels analysis ________________ Altiert Kung 2 $ 8,923.20 Panels B 90 panels and bridging analysis Doriel Scaffolding 107 s 4,500.00 Panels B 90 plywood wall Io close sidewalk for probes Urban D C. Inc. 6681 s 227,983.25 Panels B 90 panels repair (21 panels) Safway Steel Products D0055356 90 sidewalk bridge (for panels) (75% billed) $ ■

82,252.50 Scaffolding B $ 426,697.76 Business Relocation Services 12452 $ 4,583.57 Mise. 100 move-in Business Relocation Services 12454 $ 5,833.03 Mise. 90 niove-in Business Relocation Services 23252 $ 5,079.11 Mise. 100 move-in S 15,495.71 TOTAL $ 5,072,338.66 78%

Furthcoming (eslimated amountsl ATC Associates, Inc. ~ $ 1.190,385.00 Air Mon/Test AorE 90/ 100 air monitoring/analysis 3/02 • 6/02 Alhenica $ 7,304.00 Air Mon/Test AorE 100 QC air monitoring Athenica S 3,844.00 Air Mon/Test AorE 90 QC air monitoring $ 1,201,533.00 TDX 43727 $ 80,119.14 A, B, & £ 90 CM services (tee, Q/C, personnel) TDX 43728 $ 81,431,11 CM A, B&E 100 CM services (fee, G/C, personnel) 5 161,550.25 Safway Steel Products $ 27,417.50 Panels B 90 sidewalk bridge (forpanels) (25% unbilled) $ 27,417.50 TOTAL $ 1,390,500.75 22%

GRAND TOTAL I I $ 6,462,839.41 j I 700% I

CITY_2IMCl0 0_0C17 3 514 3 NYC-WTC_000359592

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000359592Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000340186

Invoices for NYC Board of Education services and materials, 90/100 Trinity.

Similar indexed content

Compare copies and versions →