NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 1 page

Invoices to NYC BOE for Trinity Place work

Machine-extracted title · confidence 42%

Board of Education invoices detailing Trinity Place projects and analyses.

NYC-WTC_000340412
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

NEW YORK CITY BOARD OF EDUCATION 90 /100 TRINITY PLACE INVOICES

as of May 21, 2002

___________________ Contractor BillinalD. Amount Scope SiibmittGci ta DstG Albert Kung $ 9,616.00 90 panels analysis Albert Kung_________________ 2 A 8,923.20 90 panels and bridging analysis ATC Associates, Inc. $ 182,768.60 90 air monitoring/analysis through 2/02 ATC Associates, inc. 2 $ 87,21520 100 air monitoring/analysis through 2/02 AWL Industries. Inc. 16 $ 111,553.23 100 HVAC rehab AWL Industries, Inc._________ 17 $ 95,929.86 90 HVAC rehab Board of Education Custodian PO-1 A 104,320.08 90/100 custodial labor/cleaning Burns and Roe 2. 3. 4. 5,6 $ 31,248.56 90 and 100 Trinity HVAC engineering Business Relocation Services 12452 $ 4,583.57 100 move-in Business Relocation Services 12454 $ 5,833.03 90 move-in Business Relocation Services 23252 $ 5,079.11 100 move-in Corinthian 1149 $ 49.000.00 100 airshaft return cleaning/reinsulation Corinthian 1150 A 2.8S7.23 100 secondary cleaning lower aud. roof Dorie) Scaffolding 107 $ 4.500.00 90 plywood wall to close sidewalk lor probes DSF (work order) 00024866-03 $ 114.53 too control valves hot water system DSF (work order) 00024866-04 $ 509.63 100 chili water valve DSF (work order) 00052472-01 $ 1,719,21 100 public address system DSF (work order) 73613 $ 2.112.35 lOQ plumbing in 12th floor bathroom DSF (work order) 00090363-01 $ 7,000,00 90/100 plumbing repairs DSF (work order) 00092514-08 $ 3,291.58 90/100 glass in walkway DSF (work order) 00093067-01 $ 1.919.64 100 locks DSF (work order) 00093074-01 s 18,144 32 100 locks, doors, door checks DSF (work order) 00093195-01 $ 4,932.29 100 door glass / metal sash windows DSF (work order) 00093200-01 $ 1,690,19 90 glass main entrance doors DSF (work order) 00093200-03 $ 1,571.01 90 doors, wood floor in gymnasium DSF (work order) 00093200-04 $ 4.619.47 90 fire hatch at stairway DSF (work order) 00093322-01 $ 518.83 90 interior glazing DSF (work order) 00093322-02 $ 1,432.21 90 door checks replacement__________________ DSF (work order) 00093322-03 $ 12.24 90 repair locks DSF (work order for Simplex) 00101279-01 $ 25,647.90 100 repair fire alarm system Kiss Construction 19 $ 514,561.23 90 interior cleaning Kiss Construction 29 $ 1,084,328.82 100 interior cleaning KW Tech 03-1001/#1 $ 32,610.00 100 ductwork insulalion replacement KWTech 03-1001/#2' $ 5,078.00 100 additional ductwork insulation L. Naro 0017J-00 $ 18,187.41 90 glass in lobby____________________________ National Environmental Safety 3704-2001-#1 $ 198,691.00 90 exterior cleaning National Environmental Safety 3705-2001-#1 $ 204,800.00 100 exterior cleaning National Environmental Safety 3705-2001-#2! $ 51,200.00 100 exterior cleaning National Environmental Safety 3704/5-2001-#1| $ 28,175.00 90/100 sidewalk bridging National Environmental Safety 3704/5-2001-#2 $ 10,225.00 90/100 sidewalk bridging National Environmental Safety 3704/5-2001-#1R $ 1,481.22 90/100 sidewalk bridging 18-day rental Safway Steel Products D0Q55356 $ 82,252.50 90 sidewalk bridge (for panels) (75% billed) Stanco Electric 2041 $ 1,031.58 90 bridge lighting Stanco Electric 2049 $ 717.16 100 troubleshoot exhaust fans 9th floor Stanco Electric 2060 1,116.40 100 troubleshoot fan shutdown relays Stanco Electric 2073 $ 632.45 100 bridge lighting Stanco Electric 2074 s 903.96 100 hr. Ilg. trouble-shoot breaker & remedy Stance Electric 2089 $ 596.52 90 bridge lighting Stanco Electric 2099 $ 847.82 1O0 bridge lighting Stanco Electric 2128 s 608.18 90 bridge lighting____________________________ Stanco Electric 2137 $ 471.02 100 bridge lighting emergency response Taylor Environmental 129 $ 30,928.00 90 air sampling Taylor Environmental 132 $ 32.465.00 100 air sampling Taylor Environmental 139 $ 43,873.00 100 air sampling Trio Asbestos 22 $ 666,946.07 100 interior clean-up Urban D.C. Inc. 6681 $ 227,983.25 90 panels repair (21 panels)__________________ V&R Mechanical 1 A 420,000.00 100 HVAC duct cleaning _______________ V&R Mechanical 8 (change order) s 1.500.00 100 damaged ductwork at 61h floor V&R Mechanical 18 (change order) A too fresh air intake grille coverings/filters_______ V&R Mechanical 19 (change order) $ 5,049.00 100 clean mixing boxes after new dampers V&R Mechanical 20 (change order) $ 1.530.00 100 clean mixing boxes (plenums) 100 reclean floors 3,5.7.9.10, basement; inspect V&R Mechanicat 56 (change order) $ 205,710.00 HVAC entire building; etc. V&R Mechanical 11581 $ 398,000.00 90 HVAC duct cleaning V&R Mechanical 1 (Change orders) $ 16,250.00 90 clean mech. room/replace metal flex Warren & Panzer Engineering 138 $ 3,950.00 asbestos monitoring @ 90 Trinity

TOTAL $ 5,072,338.66

Forthcoming (estimated amounts)

43727 80,119.14 90 CM services (fee, G/C, personnel) TDX 43728 $ 81,431.11 100 CM services (fee, GZC, personnel) Safway Steel Products__________ A 27,417.50 90 sidewalk bridge (for panels) (25% unbilled) Athenica Athenica A 9,092.00 100 QC air monitoring 6c air monitoring ___________ A 5,292.00 ATC Associates. Inc. $ 1,190,385.00 90 /100 air monitoring/analysis 3/Q2 - 6/02

TOTAL $ 1,393.736.75

CITy_21MC1OO_OO92797OS

NYC-WTC_000340412

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000340412Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →