Invoices for Trinity 90 panels and HVAC, 2002

Machine-extracted title · confidence 33%

Invoices detailing analyses and HVAC-related work at Trinity site.

NYC-WTC_000453702
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

NEW YORK CITY BOARD OF EDUCATION 90/100 TRINITY PLACE INVOICES

as of May 24, 2002

Contractor Billina I.D. Amount Scope

'ubmitted to Date Ibert Kung_______________ $ 9,616.00 90 panels analysis________________________ Ibert Kung $ 8,923.20 90 panels and bridging analysis_____________ TC Associates, Inc. 1 $ 182,768.60 90 air monitoring/analysis through 2/02________ TC Associates, Inc. $ 87,215.20100 air monitoring/analysis through 2/02______ WL Industries, Inc.________ 16 $ 111,553.23100 HVAC rehab WL Industries, Inc. 17 $95,929.86 90 HVAC rehab__________________________ oard of Education Custodian PO-1 $ 104,320.08 90.^100 custodial labor/cleaning______________ urns and Roe 2, 3, 4,5, 6 $31,248.5690and lOOTrinity HVAC engineering_________ usiness Relocation Services 12452 $4,583.57100 move-in_____________________________ usiness Relocation Services 12454 $5,833.03 90 move-in______________________________ usiness Relocation Services 23252 $5,079.11 100 move-in_____________________________ orinthian 1149 $ 49,000.00100 air shaft return cleaning/reinsulation_______ orinthian 1150 $2,867.23100 secondary cleaning lower aud. roof_______ oriel Scaffolding__________ 107 $ 4,500.00 90 plywood wall to close sidewalk for probes SF (work order) 00024866-03 $ 114.53100 control valves hot water system__________ SF (work order) 00024866-04 $ 509.63100 chill water valve______________________ SF (work order)__________ 00052472-01 $ 1,719.21100 public address system_________________ SF (work order)__________ 73613 $ 2,112.35100 plumbing in 12th floor bathroom__________ SF (work order) 00090363-01 $ 7,000.00 90.^100 plumbing repairs___________________ SF (work order)__________ 00092514-08 $3,291.58 90/100 glass in walkway___________________ SF (work order)__________ 00093067-01 $ 1,919.64100 locks_______________________________ SF (work order) 00093074-01 $ 18,144.32100 locks, doors, door checks_______________ SF (work order) 00093195-01 $4,932.29100 door glass / metal sash windows_________ SF (work order)__________ 00093200-01 $ 1,690.19 90 glass main entrance doors_______________ SF (work order)__________ 00093200-03 $ 1,571.01 90 doors, wood floor in gymnasium___________ SF (work order) 00093200-04 $ 4,619.47 90 fire hatch at stairway___________________ SF (work order) 00093322-01 $ 518.83 90 interior glazing________________________ SF (work order)__________ 00093322-02 $ 1,432.21 90 door checks replacement________________ SF (work order)__________ 00093322-03 $ 12.24 90 repair locks___________________________ SF (work order for Simclex) 00101279-01 $ 25,647.90100 repair fire alarm system iss Construction 19 $ 514,561.23 90 interior cleaning_______________________ iss Construction 29 $ 1,084,328.82100 interior cleaning______________________ WTech 03-1001/#1 $ 32,610.00100 ductwork insulation replacement_________ WTech 03-1001/#2 $ 5,078.00100 additional ductwork insulation___________ . Naro 0017J-00 $ 18,187.41 90 glass in lobby_________________________ ational Environmental Safety 3704-2001-#1 $ 198,691.00 90 exterior cleaning_______________________ ational Environmental Safety 3705-2001-#1 $ 204,800.00100 exterior cleaning______________________ ational Environmental Safety 3705-2001-#2 $ 51,200.00100 exterior cleaning______________________ ational Environmental Safety 3704/5-2001-#1 $28,175.00 90/100 sidewalk bridging__________________ ational Environmental Safety 3704/5-2001-#2 $ 10,225.00 90/100 sidewalk bridging__________________ ational Environmental Safety 3704/5-2001-#1R $ 1,481.22 90/100 sidewalk bridging 18-dav rental_______ afway Steel Products______ D0055356 $ 82,252.50 90 sidewalk bridge (for panels) (75% billed) tanco Electric 2041 $ 1,031.5890 bridge lighting_________________________ tanco Electric 2049 $ 717.16100 troubleshoot exhaust fans 9th floor________ tanco Electric 2060 $ 1,116.40100 troubleshoot fan shutdown relays_________ tanco Electric 2073 $ 632.45100 bridge lighting________________________ tanco Electric 2074 $ 903.96100 br. Itg. trouble-shoot breaker & remedy tanco Electric 2089 $ 596.5290 bridge lighting_________________________ tanco Electric 2099 $ 847.82100 bridge lighting________________________ tanco Electric 2128 $ 608.1890 bridge lighting_________________________ tanco Electric 2137 $ 471.02100 bridge lighting emergency response aylor Environmental 129 $ 30,928.00 90 air sampling__________________________ aylor Environmental_______ 132 $ 32,465.00100 air sampling_________________________ aylor Environmental_______ 139 $ 43,873.00100 air sampling_________________________ rio Asbestos 22 $ 666,946.07100 interior clean-up______________________ rban D.C. Inc. 6681 $ 227,983.25 90 panels repair (21 panels)________________ &R Mechanical $ 420,000.00100 HVAC duct cleaning___________________ &R Mechanical 8 (chanqe order; $ 1,500.00100 damaged ductwork at 6th floor___________ &R Mechanical _1_8_(chan2e_OYier; $ 966.00100 fresh air intake grille coverings/fiIters______ &R Mechanical 19 (chanqe order; $ 5,049.00100 clean mixing boxes after new dampers &R Mechanical 20 (chanqe order; $ 1,530.00100 clean mixing boxes (plenums)___________ 100 reclean floors 3,5,7,9,10, basement; inspect &R Mechanical 56 (chanqe order) $ 205,710.00 HVAC entire building; etc. &R Mechanical 11581 $ 398,000.00 90 HVAC duct cleaning____________________ &R Mechanical 1 (change orders) $ 16,250.0090 clean mech. room/replace metal flex_______ /arren & Panzer Enqineerinq 138 $ 3,950.00 asbestos monitoring @ 90 Trinity

OTAL $ 5,072,338.66

■orthcomina (estimated am<. unts) DX 43727 $ 80,119.14 90 CM services (fee, G/C, personnel)_______ DX 43728 $81,431.11 100 CM services (fee, G/C, personnel)______ afway Steel Products_________ $ 27,417.50 90 sidewalk bridge (for panels) (25% unbilled) thenica $ 7,304.00100 QC air monitoring___________________ thenica $ 3,844.0090 QC air monitoring____________________ TC Associates, Inc. $ 1,190,385.00 90/ 100 air monitoring/analysis 3/02 - 6/02

OTAL $ 1,390,500.75

'.FtAND TOTAL I $ 6,462,839.4l\

CITY_21MC100_007268448

NYC-WTC_000453702

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000453702Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →