NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 1 page

FEMA project worksheet, Feb 2002, NY BOE

Machine-extracted title · confidence 34%

Declaration and project data for WTC asbestos context.

NYC-WTC_000359489
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

FEDERAL EMERGENCY MANAGEMENT AGENCY O.M.B. No. 3067-0151 PROJECT WORKSHEET Expires April 30, 2001

------- — ~ PAPERWORK BURDEN DISCLOSURE NOTiCE Public reporting burden for thi s form is estimated to average 30 m inutes. The burden estimate includes the lime for reviewing instructions, searchino existino data sources, gathering end maintaining the needed data, and d ompleting and submitting the forms. You are not requi ted to respond to this collection cf information unless a valid 0MB control number is displayed in the upper right corner of the forms. Send comments regarding the accuracy of the burden estimate and any suggestions for reducing the burden to: Information Collection Managerr.ent, Federal Emergency Management Agency, 500 C Street, EW, Washington, DC 20472, Papem'ork Reduction Project (3067-0151). NOTE: Do not send your completed forrn to this address,________ DECLARATION NO: j PROJECT NO. FIPS NO. DATE CATEGORY FEMA- 1391 -DR. NY 061-61000-22 04/15/02 E DAMAGE FACILITY WORK COMPLETE AS OF: Public and Intermediate Schipol 89 School Clean Up 01/10/02 : 100 % APPLICANT COUNTY New York Crtv. Board of Education New York LOCATION LATHUDE LONGITUDE 201 Warren Street. New York, NY 10282__________ DAMAGE DESCRIPTION AND DIMENSIONS

The collapse of the World Trade Center (WTC) on September 11, 2001 caused s massive cloud df cdndtels and dust Id impact neighboring buildings blocks away from the World Trade Center complex. Public and Intermediate School 89 (PS/IS 89) is located at 201 Warren Street, approx imateiy three-tenths of a mile from One WTC. The dust cloud from the collapse of One WTC directly irr-.pacied the PS/IS ESfacility and coveted the building with a layer ot dust. Dust and debris entered the bui Iding threugh the ventilation eystem and through open wl ndows and doors. In addition, PS/IS SS was also used as an operations center for emergency rescue end recovery workers. Work to clean PS/IS 89 was performed from November 26, 2001 to January 10, 2002.

SCOPE OF V/ORK

Work complele consiEie of the expenses incutted by the New York City. Board of Educetion (BoE) for the work performed by the School Construction Authority (SCA). SCA will be submitting all costs to the BoE tor reimbursement. These costs include the contiectuel work for remedietion and restorstion of PShS 69 on the bee is of design, cepscity and function of the facility prior to the disaster and in conformity with applicable standards.

School Construction Authority was responsible for the coordination and ccnstruction management of the contractors performing work al PSilS 89 related to the collapse of V»'TC Costs associeled with the work performed by SCA consists of regular time labor (E2.139.05). including the New York City regular lime fringe benefit rate lor non-unitorm employees of 44.66% ($955.30). Total incurred cost lor regular time labor is £3,094,35. Costs associated with the overtime for labor for SCA (£6,030.13), i ncluding the New York City overtime fringe benefit rate for non-uniform employees of 10.73% (£647.04). Total incurred cost lor Overtime labor is £6,677.17,

SCA retained 6 subcontractors to perform duties necessary to remediate and restore PS/IS 69 Io its pre-disaster dondilion. Air Tech Lab. fnc. (Air Tech) performed clean up anc remediation operations ot the interior of the building. Corinthian Construction Company, Inc. (Corinthian) cleaned debris anc dust from the exterior facade, roof, the courtyard and playground. In addition, Corinthian removed gravel from the roof, the roof membrane was then pressure washed, and new gravel was placed on the roof, V6R Mechanical Inc, (VSR) cleaned the HVAC system of dust and debris. ATC Associates, Inc. (ATC) conducted quality dontrol air monitoring and enslyticel services, as well as visuol inspections to determine the presence of fine particulate dust. New York Environmentaf conducted aggressive sampling end transmission electron microscopy (TEM) anelysis of several floors and the HVAC unit. TDK Construction Corporation (TDX) performed conslruction oversight of all contractual activities Io insure quality of work. Total contractual costs submitted Io BoE from SCA for this project worksheet is £1.297.805.24.

See Ngrislive for detailed description of the work performed by SCA end each contractor, as well as their respective costs.

Total costs associated with this project worksheet for contractual work and labor Is $1,311,436.76

Does the Scope of Work change the pre-ci saster condition at site? □ Ves El No Special Consideration issues included? [X] Yes □ No Hazard Mitigalion proposal inoluded? □ Ves ig No Is there insurance coverage on facility? | I Ves | X| No PROJECT COST ITEM CODE NARRATIVE OUANTITY/UNIT UNIT PRICE COST 1 9003 Contract ■ School Construction Authority 1 ___ LS $1.297.805.24 $ 1,297.805.24 2 9007 Labor - Regular Time wl fringe_________ / LE £ 3.094.35 £ 3.094,35 3 9007 Labor • Overtime w/ ftinoe 1 / LS £ 6.677.17 S 6.677.17

Total £\3G7.5 76.76 PREPAKEDBY: Daniel Martin REMARKS: Project Officer FEMA Form, 90-91. SEP 98

ClTY_21MC100_005170050

NYC-WTC_000359489

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000359489Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

FEMA Project Worksheet · page 1

NYC-WTC_000251589

FEMA project worksheet and paperwork burden disclosure for disaster-related work.

Similarity score 0.985 (not a probability)

machine-extracted · confidence unavailable · Check page ↗

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000243503

FEMA project worksheet related to disaster 1391 and 2001-2002 funding paperwork.

Similar indexed content

NYC-WTC_000219967

Federal Emergency Management Agency paperwork worksheet declaring project details and burden disclosure for disaster relief efforts dated September 30, 2001.

Similar indexed content

NYC-WTC_000411636

FEMA project worksheet; details on disaster declaration and status.

Similar indexed content

FEMA project worksheet, 2001

NYC-WTC_000385737

FEMA 1391-DR-NY worksheet; declaration, project, and narrative overview.

Similar indexed content

Compare copies and versions →