NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 3 pages

FEMA application summary, 1391

Machine-extracted title · confidence 41%

Project application summary for FEMA disaster 1391; reveals site and cost figures.

NYC-WTC_000279710–000279712
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

' DATE: 07/15/2002 FEC \L EMERGENCY MANAGEMENT AGEf| 'PROJECT APPLICATION SUMMARY (P.2) DISASTER#: 1391

PACKAGE NO: 45

P.A. ID: 061-51000-22’ APPLICANT: NEW YORK / EDUCATION, BOARD OF, EDUCATION, BOARD OF PW# VSN CAT INF COST SHR PROJECTED COMPL DATE APPROVED PW AMOUNT

732 0 E N N 03/11/2003 $1,307,576.76 Site Number: 1 DAMAGED FACILITY: NYC BOARD OF EDUCATION

FACILITY LOCATION: 201 WARREN STREET, NEW YORK10282

SCOPE OF WORK: WORK COMPLETE CONSISTS OF THE EXPENSES INCURRED BY THE NEW YORK CITY, BOARD OF EDUCATION (BOE) FOR THE WORK PERFORMED BY THE SCHOOL CONSTRUCTION AUTHORITY (SCA). SCA WILL BE SUBMITTING ALL COSTS TO THE BOE FOR REIMBURSEMENT. THESE COSTS INCLUDE THE CONTRACTUAL WORK FOR REMEDIATION AND RESTORATION OF PS/IS 89 ON THE BASIS OF DESIGN, CAPACITY AND FUNCTION OF THE FACILITY PRIOR TO THE DISASTER AND IN CONFORMITY WITH APPLICABLE STANDARDS. SCHOOL CONSTRUCTION AUTHORITY WAS RESPONSIBLE FOR THE COORDINATION AND CONSTRUCTION MANA(;EMENT of the contractors PERFORMING WORK AT PS/IS 89 RELATED TO THE COLLAPSE OF WTC. COSTS ASSOCIATED WITH THE WORK PERFORMED BY SCA CONSISTS OF REGULAR TIME LABOR ($2 139 05) INCLUDING THE NEW YORK CITY REGULAR TIME FRINGE BENEFIT RATE FOR NON-UNIFORM EMPLOYEES OF 44.66% ($955.30). TOTAL INCURRED COST FOR REGULAR TIME LABOR IS $3,094.35. COSTS ASSOCIATED WITH THE OVERTIME FOR LABOR FOR SCA ($6,030.13), INCLUDING THE NEW YORK CITY OVERTIME FRINGE BENEFIT RATE FOR NON-UNIFORM EMPLOYEES OF 10.73% ($647.04). TOTAL INCURRED COST FOR OVERTIME LABOR IS $6,677.17. SCA RETAINED 6 SUBCONTRACTORS TO PERFORM DUTIES NECESSARY TO REMEDIATE AND RESTORE PS/IS 89 TO ITS PRE-DISASTER CONDITION. AIR TECH LAB, INC. (AIR TECH) PERFORMED CLEAN UP AND REMEDIATION OPERATIONS OF THE INTERIOR OF THE BUILDING. CORINTHIAN CONSTRUCTION COMPANY, INC. (CORINTHIAN) CLEANED DEBRIS AND DUST FROM THE EXTERIOR FACADE, ROOF, THE COURTYARD AND PLAYGROUND IN ADDITION, CORINTHIAN REMOVED GRAVEL FROM THE ROOF, THE ROOF MEMBRANE WAS THEN PRESSURE WASHED, AND NEW GRAVEL WAS PLACED ON THE ROOF. V&R MECHANICAL INC. (V&R) CLEANED THE HVAC SYSTEM OF DUST AND DEBRIS. ATC ASSOCIATES, INC. (ATC) CONDUCTED QUALITY CONTROL AIR MONITORING AND ANALYTICAL SERVICES, AS WELL AS VISUAL INSPECTIONS TO DETERMINE THE PRESENCE OF FINE PARTICULATE DUST. NEW YORK ENVIRONMENTAL CONDUCTED AGGRESSIVE SAMPLING AND TRANSMISSION ELECTRON MICROSCOPY (TEM) ANALYSIS OF SEVERAL FLOORS AND TH E HVAC UNIT. TDX CONSTRUCTION CORPORATION (TDX) PERFORMED CONSTRUCTION OVERSIGHT OF ALL CONTRACTUAL ACTIVITIES TO INSURE QUALITY OF WORK. TOTAL CONTRACTUAL COSTS SUBMITTED TO BOE FROM .SCA FOR THIS PROJECT WORKSHEET IS $1,297,805.24. SEE NARRATIVE FOR DETAILED DESCRIPTION OF THE WORK PERFORMED BY SCA AND EACH CONTRACTOR, AS WELL AS THEIR RESPECTIVE COSTS.

TOTAL COSTS ASSOCIATED WITH THIS PROJECT WORKSHEET FOR CONTRACTUAL WORK AND LABOR IS $1,307,376.76.

3PWs $ AMOUNT ELIGIBLE $ FEDERAL SHARE PWs: $4,093,112.81 $4,093,112.81 SUBGRANTEE ADMIN EXP: $20,465.57 $20,465.57 TOTAL: $4,113,578.38 $4,113,578.38

Page 9 of 12

CITY_21MC100_009109204

NYC-WTC_000279712

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000279712Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000411638

FEMA project summary for PS 234 site mitigation and cost reimbursement.

Similar indexed content

Compare copies and versions →