NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 68 pages

Table of contents, transportation/public safety, mid-1990s

Machine-extracted title · confidence 41%

Contents for safety sections, departments and commissions.

NYC-WTC_000355006–000355073
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Key FY99 Major Accomplishments FY96 FY98 Measurements Actual ■ ' AtnuaT'" ' ■ Actual Actual

I Ditch Restorations Completed Miles Resurfaced 5,872 44 7,647 __ 108 9,505________8,836 158_________ 183 I I Expanded hot-in-place recycling of streets. The hot-in-place (HIP) process "recycles" streets by digging existing I asphalt, mixing it with rejuvenating

I Potholes Repaired Streetlight Minor Repairs 81,098 35,801 36,295 27,901 21,877 23,750 16,202 19,999 I I I chemicals that restore the asphalt to its original condition, and placing the recycled material back on the street in Traffic Linestriping Square Feet Applied 166,917 725,448 713,504 1,121,337

I Traffic Signal Malfunction Repairs 25,282 24,092 23,995 23,866 I I I exactly the same manner as conven- tional resurfacing. Using HIP, a resur- facing project is completed in several I hours instead of several weeks, at 98 percent from 1994. Most of the 116 ditches 36,295 in FY97. In FY99, the Department

I that remained open in November 1998 had just been created during the latter part of November when colder temperatures prevent continued to repair all reported potholes with­ in three working days during the primary pot­ hole repair season of March and April and '> approximately $1,40 per square yard less than the conventional method. ( Based on the success of a pilot pro- |j gram completed last summer as part of

I City crews from restoring the ditches. For this improved response time from six to three days reason, the Department will really always have during the rest of the year. The Department the Highway Reengineering Pilot, the J Departmenthas expanded the use of some ditches open at the end of the season. beUeves that the multi-year decUne in the The actual number of ditches restored in number of actual repairs needed, which I HIP from 500,000 to 900,000 square yards annually throughout the city. I FY99 was lower than in FY98 because there were seven percent fewer ditch openings in need of repair. decreased by 40 percent in FY98 and by approximately 55 percent in FY99 as com­ pared to FY97, is due to increases in street I Using HIP saved the City approximately I $1.26 million in FY99. Square feet of Unestriping placed: resurfacing and street maintenance from the Completed LED program. In June

I 1,121,337 in FY99, up from 713,504 in FY98 and 725,448 in FY97. The Department purchased new linestriping equip­ Highway Reengineering Pilot as well as the mild winters experienced during the last two years. 1999, the Department completed a two-year $2.33 million replacement of over 26,000 red traffic signals with

I ment in FY97 and increased the productivity of its crews. The 57 percent increase in the square feet of Unestriping placed in FY99 is Number of minor repairs to the street­ lighting system: 19,999 in FY99, down from 23,750 in FY98 and 27,901 in I I I long-life, energy-efficient, light emit- ting diode (LED) signals. Intensive test- ing shows that LED signals are due to use of this equipment and the deploy­ FY97. To ensure that streets are well-lit for I brighter, less likely to burn out than

I ment of an additional linestriping crew. Increases in productivity derived from the Highway Reengineering Pilot and hot-in-place pedestrians and vehicles, the Streets Depart­ ment makes continual repairs to the street- lighting system. FY99’s 16 percent reduction I I I traditional traffic lights, and consume 83 percent less energy than incandes- cent bulbs. These devices, moreover, recycling of streets (which is described in the in the number of repairs reflects the success of I have a useful life in excess of six Major Accomplishments section of this chap­ the Department’s ongoing capital program, I years, compared to a useful life of one ter) have allowed the Department to add which replaces older fixtures and lamps with |! year for conventional bulbs. The another linestriping crew from personnel pre­ newer and brighter lights which require fewer I Department estimates that savings viously assigned to other functions. Linestrip­ repairs. In each year since FY95, the Depart­ I from LEDs reached $751,000 in FY99 ing crews also increased the number of cross­ ment has completed all minor repairs request­ I and will be $887,000 annually begin- walks linestriped by nearly 48 percent from ed by citizens within one day. The Department I ning in FY2000. 1,360 in FY98 to 2,009 in FY99. also performs spot-checks every weeknight to I Began Chestnut Street improve-

I Number of potholes repaired: 16,202 in FY99, down from 21,877 in FY98 and find and replace malfunctioning Ughts. continued on next page I I I ment project The Department com- pleted the design phase of a streetscaping improvement project on

I The Highway Division Has Significantly Reduced The Backlog of Ditch Openings At The End of The Paving ■ . Chestnut Street from 6th to 22nd Streets in December 1998. Construc­ tion began in March 1999 and is Season Since 1994 expected to be complete by the end of the year 2000. When completed, this $17.1 million project will have widened Chestnut Street from 20 feet to 28 feet J. 5,096 so that it can be re-opened to daytime O o (j motor vehicle traffic. The Department i plans to expand Chestnut Street to S g »■’ J three lanes to accommodate a SEPTA So - |f bus route, dedicate one lane for park­ ing and loading for local businesses, I and open the third lane to traffic.

847

I ..V®

I •The paving season runs from March through November of each calendar year. Streets Department 33

NYC-WTC_000355035

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000355035Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000245464

Permit application unrelated excerpt; contains mayoral report and NYC identifiers; likely overarching documents for school-related permit.

Similar indexed content

NYC-WTC_000195490

Invoice from the Office of Management and Budget regarding services provided by the Office of the Chief Medical Examiner in 2002.

Similar indexed content