NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 67 pages

Table of contents, transportation report, 1990s

Machine-extracted title · confidence 38%

Contents listing for a transportation/public safety report collection.

NYC-WTC_000354877–000354943
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

I Key FY94 FY95 FY96 ” I FY97 g Majoir Accomplishments

Measurements Actual Actual Actual Actual I

I Miles Resurfaced Potholes Repaired ___ « 72,776 __ 38 44,893 44 81,098 36,295 108 I Replaced 3,105 intersections with I curb cuts in compliance with the I Americans with Disabilities Act At I the end of FY97, the total number of

I Number of Working Days to Repairs Pothole (Peak Season) Number of Working Days to Repaira Pothole N/A N/A 5 4 I curb cuts completed reached 12.816. I nearly 80 percent of all intersections in I the city. As a result, the City is on pace (Non-Peak Season) N/A N/A ___ 9 ____ 8 I to place curb cuts in all intersections in

I Street Light Minor Repairs Response Time for Minor Street Light Repair (in days) 53,531

1 50.018

____ 1_ 35.801

1 27.901

___ 1_ I the City by the year 2001 —four years I ahead of the stated federal guidelines that require City compliance by the S year 2005. Traffic Signal Malfunction Repairs N/A 23.037 25.282 24.092 Response Time for Traffic Signal Malfunction Repair I Completed the Logan Square (in days) 2.1 2.1 1.6 1.5 improvement project to expand the Logan Square Park area. As part of

I 166,917 square feet placed in FY96. Approximately 25 percent of all linestrip­ ing capital program, begun in FY90, to replace all fixtures and lamps with newer and blister the $900,000 project which was com­ pleted in April 1997, the Department widened sidewalks, planted trees, and I made other structural improvements to I ing was for crosswalks placed near public schools to help make those areas safer for children who walk to school. lights. Not only are the new lights brighter than the old lights, but they also require fewer repairs. To date, the Department has replaced I I the Logan Square area, allowing the City to restore Logan Square Park to Number of potholes repaired: 36,295 in approximately 50,000 streetlights, half of the many of the specifications in William

I FY97, down from 81,098 in FY96 and 44,893 in FY95. In FY97, the Department repaired all reported potholes within four 100,000 lights scheduled for replacement by FY2000. In FY97, all minor repairs requested by phone were completed within one day of j

, Penn's original "green-country town” city plan. The expansion of Logan Square was completed under the fed- working days during die primary pothole notification. In addition, the Department also , eral Intermodal Surface Transportation

I repair season of March and April and within eight working days the rest of the year. As a result of this winter’s mild weather, the actual performs spot-checks every weeknight to find and replace malfunctioning streedights. Number of repairs to malfhnctiomiig I I I Efficiency Act (ISTEA) which provides funding for innovative traffic engineer- ing programs and has allowed the Department to redesign traffic systems

I number of repairs needed in FY97 was less than half the 81,098 repairs necessitated by the Blizzard in FY96. traffic signals: 24,092 in FY97 down from 25,282 in FTOO and up from 23,037 in FY95. Responding to signal mal­ i. to increase the size of adjoining park and recreational areas. Number of minor repairs to the street- functions is an important measure of die Completed the reconstniction of lighting system: 27,901 in FY97, down Department’s ability to maintain safe streets the 54th Street Bridge in June 1997. from 35,801 in FY96 and 50,018 in and regulate traffic flow. The Department’s At a cost of $2.5 million, the Depart­ FY95, The Streets Department makes repairs traffic unit responded to all reports of signal ment reconstructed and strengthened to the streetlighting system in order to ensure malfunctions within 48 hours, either to per­ the bridge spanning the AMTRAK train that streets are well-lit for vehicles and pedes­ trians. FY97’s 22 percent reduction in repairs form the necessary repair or to safeguard the intersection until the signal could be repaired. I tracks between Grays and Paschall Avenues. These improvements will add reflects the success of the Department’s ongo- 40 years to the life of the bridge, which

I i is part of a major traffic route.

A Mild Winter Reduced the Number of Pothole Repairs I Required in 1997 I I 81,098 a 72,776 to ! i /- I 44,715 IB sz- 43,223 30,234 Mil 36,295 MM

I I z Note: The increases in FY94 and i=Y96 were due to the ice storms z / of 1994 and the Blizzard of 1996 respectively.

I Streets Department 33

NYC-WTC_000354906

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000354906Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000245464

Permit application unrelated excerpt; contains mayoral report and NYC identifiers; likely overarching documents for school-related permit.

Similar indexed content

NYC-WTC_000195490

Invoice from the Office of Management and Budget regarding services provided by the Office of the Chief Medical Examiner in 2002.

Similar indexed content

Compare copies and versions →